{"id":9260,"date":"2022-11-28T13:26:01","date_gmt":"2022-11-28T13:26:01","guid":{"rendered":"https:\/\/www.vielca.com\/proyectos\/reforma-de-la-edar-de-castellon"},"modified":"2023-01-24T10:56:52","modified_gmt":"2023-01-24T10:56:52","slug":"reforma-de-la-edar-de-castellon","status":"publish","type":"proyectos","link":"https:\/\/www.vielca.com\/en\/proyectos\/reforma-de-la-edar-de-castellon","title":{"rendered":"REFORM OF THE WWTP OF CASTELL\u00d3N"},"content":{"rendered":"<p>The main objectives to be achieved with this project to improve and reform the Castell\u00f3n <a href=\"https:\/\/www.vielca.com\/ambitos\/hidraulica\">WWTP<\/a>, in order of priority, are:<\/p>\n<ul>\n<li>Minimize the number of unit processes involved in the water and sludge line. This implies a change in the type of treatment, i.e. a change from a conventional activated sludge process to a prolonged aeration process, where the sludge is highly stabilized and the sludge line is greatly simplified.<\/li>\n<li>Expansion of the treatment flow from the current 45,000 m3\/day to 60,000 m3\/day (300,000 inhab-eq). To this end, and given the limited space, a new membrane bioreactor (MBR) treatment line will be designed.<\/li>\n<li>Arrangement of a Regulation Tank to treat the flow tips. It is intended that the plant works at a constant flow, achieving a more stable process and simplifying exploitation tasks.<\/li>\n<li>Optimization and reform of the facilities of the water treatment plant of Castell\u00f3n, to improve the quality of the treated water, allowing it to be reused for irrigation.<\/li>\n<li>Minimise the environmental impact of the facilities, both inside and around their location, with particular emphasis on the issue of deodorisation.<\/li>\n<\/ul>\n<h5>The works that are projected are:<\/h5>\n<ul>\n<li>Two new piston-flow biological reactors of 20,382 m3 and 20,460 m3 each, as well as connection to existing facilities.<\/li>\n<\/ul>\n<h5>The MBR line consists of:<\/h5>\n<ul>\n<li>New Pretreatment: Two (2) grinding\/screening channels equipped with two (2) rototamines. Two lines of desanding-degreasing. Extraction-classification of sands and concentration of fats<\/li>\n<li>New Regulatory Tank of 8,000 m3 and pumping feed to MBR reactors<\/li>\n<li>New membrane biological reactors (MBR), 4 units, with a unit flow rate of 9,000 m3\/day.<\/li>\n<li>Two UV disinfection lines in channel and chlorination tank<\/li>\n<li>Two (2) flotation thickeners<\/li>\n<\/ul>\n<p>Includes: electrical installations; control and instrumentation; auxiliary services; deodorization system; various buildings for equipment accommodation, control, changing rooms and workshop.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The main objectives to be achieved with this project to improve and reform the Castell\u00f3n WWTP, in order of priority, are: Minimize the number of unit processes involved in the water and sludge line. This implies a change in the type of treatment, i.e. a change from a conventional activated sludge process to a prolonged [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":6130,"template":"","format":"standard","meta":{"footnotes":""},"ambito_proyecto":[229],"pais_proyecto":[239],"class_list":["post-9260","proyectos","type-proyectos","status-publish","format-standard","has-post-thumbnail","hentry","ambito_proyecto-hydraulics-and-water-treatment","pais_proyecto-spain"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\r\n<title>REFORM OF THE WWTP OF CASTELL\u00d3N - Vielca Ingenieros<\/title>\r\n<meta name=\"description\" content=\"Project to improve and reform the Castell\u00f3n WWTP is aimed at optimizing and minimizing the environmental impact of the facilities\" \/>\r\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\r\n<link rel=\"canonical\" href=\"https:\/\/www.vielca.com\/en\/proyectos\/reforma-de-la-edar-de-castellon\" \/>\r\n<meta property=\"og:locale\" content=\"en_US\" \/>\r\n<meta property=\"og:type\" content=\"article\" \/>\r\n<meta property=\"og:title\" content=\"REFORM OF THE WWTP OF CASTELL\u00d3N - Vielca Ingenieros\" \/>\r\n<meta property=\"og:description\" content=\"Project to improve and reform the Castell\u00f3n WWTP is aimed at optimizing and minimizing the environmental impact of the facilities\" \/>\r\n<meta property=\"og:url\" content=\"https:\/\/www.vielca.com\/en\/proyectos\/reforma-de-la-edar-de-castellon\" \/>\r\n<meta property=\"og:site_name\" content=\"Vielca Ingenieros\" \/>\r\n<meta property=\"article:modified_time\" content=\"2023-01-24T10:56:52+00:00\" \/>\r\n<meta property=\"og:image\" content=\"https:\/\/www.vielca.com\/wp-content\/uploads\/2022\/11\/edar_cast_cb-1024x500.png\" \/>\r\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\r\n\t<meta property=\"og:image:height\" content=\"500\" \/>\r\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\r\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\r\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\r\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vielca.com\\\/en\\\/proyectos\\\/reforma-de-la-edar-de-castellon\",\"url\":\"https:\\\/\\\/www.vielca.com\\\/en\\\/proyectos\\\/reforma-de-la-edar-de-castellon\",\"name\":\"REFORM OF THE WWTP OF CASTELL\u00d3N - Vielca Ingenieros\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vielca.com\\\/en#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vielca.com\\\/en\\\/proyectos\\\/reforma-de-la-edar-de-castellon#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.vielca.com\\\/en\\\/proyectos\\\/reforma-de-la-edar-de-castellon#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.vielca.com\\\/wp-content\\\/uploads\\\/2022\\\/11\\\/edar_cast_cb.png\",\"datePublished\":\"2022-11-28T13:26:01+00:00\",\"dateModified\":\"2023-01-24T10:56:52+00:00\",\"description\":\"Project to improve and reform the Castell\u00f3n WWTP is aimed at optimizing and minimizing the environmental impact of the facilities\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vielca.com\\\/en\\\/proyectos\\\/reforma-de-la-edar-de-castellon#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.vielca.com\\\/en\\\/proyectos\\\/reforma-de-la-edar-de-castellon\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.vielca.com\\\/en\\\/proyectos\\\/reforma-de-la-edar-de-castellon#primaryimage\",\"url\":\"https:\\\/\\\/www.vielca.com\\\/wp-content\\\/uploads\\\/2022\\\/11\\\/edar_cast_cb.png\",\"contentUrl\":\"https:\\\/\\\/www.vielca.com\\\/wp-content\\\/uploads\\\/2022\\\/11\\\/edar_cast_cb.png\",\"width\":2560,\"height\":1250,\"caption\":\"REFORMA DE LA EDAR DE CASTELL\u00d3N\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vielca.com\\\/en\\\/proyectos\\\/reforma-de-la-edar-de-castellon#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/www.vielca.com\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Proyectos\",\"item\":\"https:\\\/\\\/www.vielca.com\\\/en\\\/proyectos\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"REFORM OF THE WWTP OF CASTELL\u00d3N\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vielca.com\\\/en#website\",\"url\":\"https:\\\/\\\/www.vielca.com\\\/en\",\"name\":\"Vielca Ingenieros\",\"description\":\"El referente en la ingenier\u00eda\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vielca.com\\\/en#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.vielca.com\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vielca.com\\\/en#organization\",\"name\":\"Vielca Ingenieros\",\"url\":\"https:\\\/\\\/www.vielca.com\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.vielca.com\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.vielca.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/VIELCA-INGENIEROS-logotipo.png\",\"contentUrl\":\"https:\\\/\\\/www.vielca.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/VIELCA-INGENIEROS-logotipo.png\",\"width\":1527,\"height\":477,\"caption\":\"Vielca Ingenieros\"},\"image\":{\"@id\":\"https:\\\/\\\/www.vielca.com\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/vielca-ingenieros-s.a.\",\"https:\\\/\\\/www.instagram.com\\\/vielca_ingenieros\\\/\"]}]}<\/script>\r\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"REFORM OF THE WWTP OF CASTELL\u00d3N - Vielca Ingenieros","description":"Project to improve and reform the Castell\u00f3n WWTP is aimed at optimizing and minimizing the environmental impact of the facilities","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.vielca.com\/en\/proyectos\/reforma-de-la-edar-de-castellon","og_locale":"en_US","og_type":"article","og_title":"REFORM OF THE WWTP OF CASTELL\u00d3N - Vielca Ingenieros","og_description":"Project to improve and reform the Castell\u00f3n WWTP is aimed at optimizing and minimizing the environmental impact of the facilities","og_url":"https:\/\/www.vielca.com\/en\/proyectos\/reforma-de-la-edar-de-castellon","og_site_name":"Vielca Ingenieros","article_modified_time":"2023-01-24T10:56:52+00:00","og_image":[{"width":1024,"height":500,"url":"https:\/\/www.vielca.com\/wp-content\/uploads\/2022\/11\/edar_cast_cb-1024x500.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.vielca.com\/en\/proyectos\/reforma-de-la-edar-de-castellon","url":"https:\/\/www.vielca.com\/en\/proyectos\/reforma-de-la-edar-de-castellon","name":"REFORM OF THE WWTP OF CASTELL\u00d3N - Vielca Ingenieros","isPartOf":{"@id":"https:\/\/www.vielca.com\/en#website"},"primaryImageOfPage":{"@id":"https:\/\/www.vielca.com\/en\/proyectos\/reforma-de-la-edar-de-castellon#primaryimage"},"image":{"@id":"https:\/\/www.vielca.com\/en\/proyectos\/reforma-de-la-edar-de-castellon#primaryimage"},"thumbnailUrl":"https:\/\/www.vielca.com\/wp-content\/uploads\/2022\/11\/edar_cast_cb.png","datePublished":"2022-11-28T13:26:01+00:00","dateModified":"2023-01-24T10:56:52+00:00","description":"Project to improve and reform the Castell\u00f3n WWTP is aimed at optimizing and minimizing the environmental impact of the facilities","breadcrumb":{"@id":"https:\/\/www.vielca.com\/en\/proyectos\/reforma-de-la-edar-de-castellon#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.vielca.com\/en\/proyectos\/reforma-de-la-edar-de-castellon"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.vielca.com\/en\/proyectos\/reforma-de-la-edar-de-castellon#primaryimage","url":"https:\/\/www.vielca.com\/wp-content\/uploads\/2022\/11\/edar_cast_cb.png","contentUrl":"https:\/\/www.vielca.com\/wp-content\/uploads\/2022\/11\/edar_cast_cb.png","width":2560,"height":1250,"caption":"REFORMA DE LA EDAR DE CASTELL\u00d3N"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vielca.com\/en\/proyectos\/reforma-de-la-edar-de-castellon#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.vielca.com\/en"},{"@type":"ListItem","position":2,"name":"Proyectos","item":"https:\/\/www.vielca.com\/en\/proyectos"},{"@type":"ListItem","position":3,"name":"REFORM OF THE WWTP OF CASTELL\u00d3N"}]},{"@type":"WebSite","@id":"https:\/\/www.vielca.com\/en#website","url":"https:\/\/www.vielca.com\/en","name":"Vielca Ingenieros","description":"El referente en la ingenier\u00eda","publisher":{"@id":"https:\/\/www.vielca.com\/en#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.vielca.com\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.vielca.com\/en#organization","name":"Vielca Ingenieros","url":"https:\/\/www.vielca.com\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.vielca.com\/en#\/schema\/logo\/image\/","url":"https:\/\/www.vielca.com\/wp-content\/uploads\/2022\/10\/VIELCA-INGENIEROS-logotipo.png","contentUrl":"https:\/\/www.vielca.com\/wp-content\/uploads\/2022\/10\/VIELCA-INGENIEROS-logotipo.png","width":1527,"height":477,"caption":"Vielca Ingenieros"},"image":{"@id":"https:\/\/www.vielca.com\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/vielca-ingenieros-s.a.","https:\/\/www.instagram.com\/vielca_ingenieros\/"]}]}},"_links":{"self":[{"href":"https:\/\/www.vielca.com\/en\/wp-json\/wp\/v2\/proyectos\/9260","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vielca.com\/en\/wp-json\/wp\/v2\/proyectos"}],"about":[{"href":"https:\/\/www.vielca.com\/en\/wp-json\/wp\/v2\/types\/proyectos"}],"author":[{"embeddable":true,"href":"https:\/\/www.vielca.com\/en\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":2,"href":"https:\/\/www.vielca.com\/en\/wp-json\/wp\/v2\/proyectos\/9260\/revisions"}],"predecessor-version":[{"id":9731,"href":"https:\/\/www.vielca.com\/en\/wp-json\/wp\/v2\/proyectos\/9260\/revisions\/9731"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vielca.com\/en\/wp-json\/wp\/v2\/media\/6130"}],"wp:attachment":[{"href":"https:\/\/www.vielca.com\/en\/wp-json\/wp\/v2\/media?parent=9260"}],"wp:term":[{"taxonomy":"ambito_proyecto","embeddable":true,"href":"https:\/\/www.vielca.com\/en\/wp-json\/wp\/v2\/ambito_proyecto?post=9260"},{"taxonomy":"pais_proyecto","embeddable":true,"href":"https:\/\/www.vielca.com\/en\/wp-json\/wp\/v2\/pais_proyecto?post=9260"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}