{"id":9353,"date":"2022-08-11T07:36:57","date_gmt":"2022-08-11T07:36:57","guid":{"rendered":"https:\/\/www.vielca.com\/proyectos\/proyecto-basico-y-de-ejecucion-de-reforma-integral-y-ampliacion-de-la-seccio-i-e-s-serra-espada"},"modified":"2026-11-17T18:08:25","modified_gmt":"2026-11-17T17:08:25","slug":"proyecto-basico-y-de-ejecucion-de-reforma-integral-y-ampliacion-de-la-seccio-i-e-s-serra-espada","status":"publish","type":"proyectos","link":"https:\/\/www.vielca.com\/en\/proyectos\/proyecto-basico-y-de-ejecucion-de-reforma-integral-y-ampliacion-de-la-seccio-i-e-s-serra-espada","title":{"rendered":"BASIC AND EXECUTION PROJECT FOR THE COMPREHENSIVE REFORM AND EXPANSION OF THE HIGHSCHOOL SERRA ESPAD\u00c0 SECTION"},"content":{"rendered":"<p>Drafting of the Basic and Execution Project that includes the renovation works in the existing building and the extension works to respond to the new functional programme of the Department of Education, Research, Culture and Sport.<\/p>\n<p>The built area is 8,707.31 m<sup>2<\/sup>.<\/p>\n<p>Work included the drafting of the Safety and Health Study and the following facility projects:<\/p>\n<ul>\n<li>Electrical facilities at Low Voltage.<\/li>\n<li>Thermal facilities (Heating, Ventilation and Solar Hot Water Production).<\/li>\n<li>Gas facilities.<\/li>\n<li>Water Receiving Facility (Plumbing and Sanitation).<\/li>\n<li>Special Facilities (Fire Protection Facilities, Security against the risk of imprisonment, Protection against intrusion, Lightning rods, Audiovisual Facilities, Public Address, Video Intercom, Class Change Bell, Voice and Data Infrastructure, Building Management System).<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Drafting of the Basic and Execution Project that includes the renovation works in the existing building and the extension works to respond to the new functional programme of the Department of Education, Research, Culture and Sport. The built area is 8,707.31 m2. Work included the drafting of the Safety and Health Study and the following [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5289,"template":"","format":"standard","meta":{"footnotes":""},"ambito_proyecto":[226],"pais_proyecto":[239],"class_list":["post-9353","proyectos","type-proyectos","status-publish","format-standard","has-post-thumbnail","hentry","ambito_proyecto-architecture-and-urban-planning","pais_proyecto-spain"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\r\n<title>BASIC AND EXECUTION PROJECT FOR THE COMPREHENSIVE REFORM AND EXPANSION OF THE HIGHSCHOOL SERRA ESPAD\u00c0 SECTION - Vielca Ingenieros<\/title>\r\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\r\n<link rel=\"canonical\" href=\"https:\/\/www.vielca.com\/en\/proyectos\/proyecto-basico-y-de-ejecucion-de-reforma-integral-y-ampliacion-de-la-seccio-i-e-s-serra-espada\" \/>\r\n<meta property=\"og:locale\" content=\"en_US\" \/>\r\n<meta property=\"og:type\" content=\"article\" \/>\r\n<meta property=\"og:title\" content=\"BASIC AND EXECUTION PROJECT FOR THE COMPREHENSIVE REFORM AND EXPANSION OF THE HIGHSCHOOL SERRA ESPAD\u00c0 SECTION - Vielca Ingenieros\" \/>\r\n<meta property=\"og:description\" content=\"Drafting of the Basic and Execution Project that includes the renovation works in the existing building and the extension works to respond to the new functional programme of the Department of Education, Research, Culture and Sport. The built area is 8,707.31 m2. Work included the drafting of the Safety and Health Study and the following [&hellip;]\" \/>\r\n<meta property=\"og:url\" content=\"https:\/\/www.vielca.com\/en\/proyectos\/proyecto-basico-y-de-ejecucion-de-reforma-integral-y-ampliacion-de-la-seccio-i-e-s-serra-espada\" \/>\r\n<meta property=\"og:site_name\" content=\"Vielca Ingenieros\" \/>\r\n<meta property=\"article:modified_time\" content=\"2026-11-17T17:08:25+00:00\" \/>\r\n<meta property=\"og:image\" content=\"https:\/\/www.vielca.com\/wp-content\/uploads\/2022\/08\/IES-19-SG1861_1306-2-e1668068088112.jpg\" \/>\r\n\t<meta property=\"og:image:width\" content=\"981\" \/>\r\n\t<meta property=\"og:image:height\" content=\"1000\" \/>\r\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\r\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\r\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\r\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vielca.com\\\/en\\\/proyectos\\\/proyecto-basico-y-de-ejecucion-de-reforma-integral-y-ampliacion-de-la-seccio-i-e-s-serra-espada\",\"url\":\"https:\\\/\\\/www.vielca.com\\\/en\\\/proyectos\\\/proyecto-basico-y-de-ejecucion-de-reforma-integral-y-ampliacion-de-la-seccio-i-e-s-serra-espada\",\"name\":\"BASIC AND EXECUTION PROJECT FOR THE COMPREHENSIVE REFORM AND EXPANSION OF THE HIGHSCHOOL SERRA ESPAD\u00c0 SECTION - Vielca Ingenieros\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vielca.com\\\/en#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vielca.com\\\/en\\\/proyectos\\\/proyecto-basico-y-de-ejecucion-de-reforma-integral-y-ampliacion-de-la-seccio-i-e-s-serra-espada#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.vielca.com\\\/en\\\/proyectos\\\/proyecto-basico-y-de-ejecucion-de-reforma-integral-y-ampliacion-de-la-seccio-i-e-s-serra-espada#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.vielca.com\\\/wp-content\\\/uploads\\\/2022\\\/08\\\/IES-19-SG1861_1306-2-e1668068088112.jpg\",\"datePublished\":\"2022-08-11T07:36:57+00:00\",\"dateModified\":\"2026-11-17T17:08:25+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vielca.com\\\/en\\\/proyectos\\\/proyecto-basico-y-de-ejecucion-de-reforma-integral-y-ampliacion-de-la-seccio-i-e-s-serra-espada#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.vielca.com\\\/en\\\/proyectos\\\/proyecto-basico-y-de-ejecucion-de-reforma-integral-y-ampliacion-de-la-seccio-i-e-s-serra-espada\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.vielca.com\\\/en\\\/proyectos\\\/proyecto-basico-y-de-ejecucion-de-reforma-integral-y-ampliacion-de-la-seccio-i-e-s-serra-espada#primaryimage\",\"url\":\"https:\\\/\\\/www.vielca.com\\\/wp-content\\\/uploads\\\/2022\\\/08\\\/IES-19-SG1861_1306-2-e1668068088112.jpg\",\"contentUrl\":\"https:\\\/\\\/www.vielca.com\\\/wp-content\\\/uploads\\\/2022\\\/08\\\/IES-19-SG1861_1306-2-e1668068088112.jpg\",\"width\":981,\"height\":1000,\"caption\":\"ARQUITECTOS\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vielca.com\\\/en\\\/proyectos\\\/proyecto-basico-y-de-ejecucion-de-reforma-integral-y-ampliacion-de-la-seccio-i-e-s-serra-espada#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/www.vielca.com\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Proyectos\",\"item\":\"https:\\\/\\\/www.vielca.com\\\/en\\\/proyectos\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"BASIC AND EXECUTION PROJECT FOR THE COMPREHENSIVE REFORM AND EXPANSION OF THE HIGHSCHOOL SERRA ESPAD\u00c0 SECTION\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vielca.com\\\/en#website\",\"url\":\"https:\\\/\\\/www.vielca.com\\\/en\",\"name\":\"Vielca Ingenieros\",\"description\":\"El referente en la ingenier\u00eda\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vielca.com\\\/en#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.vielca.com\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vielca.com\\\/en#organization\",\"name\":\"Vielca Ingenieros\",\"url\":\"https:\\\/\\\/www.vielca.com\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.vielca.com\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.vielca.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/VIELCA-INGENIEROS-logotipo.png\",\"contentUrl\":\"https:\\\/\\\/www.vielca.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/VIELCA-INGENIEROS-logotipo.png\",\"width\":1527,\"height\":477,\"caption\":\"Vielca Ingenieros\"},\"image\":{\"@id\":\"https:\\\/\\\/www.vielca.com\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/vielca-ingenieros-s.a.\",\"https:\\\/\\\/www.instagram.com\\\/vielca_ingenieros\\\/\"]}]}<\/script>\r\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"BASIC AND EXECUTION PROJECT FOR THE COMPREHENSIVE REFORM AND EXPANSION OF THE HIGHSCHOOL SERRA ESPAD\u00c0 SECTION - Vielca Ingenieros","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.vielca.com\/en\/proyectos\/proyecto-basico-y-de-ejecucion-de-reforma-integral-y-ampliacion-de-la-seccio-i-e-s-serra-espada","og_locale":"en_US","og_type":"article","og_title":"BASIC AND EXECUTION PROJECT FOR THE COMPREHENSIVE REFORM AND EXPANSION OF THE HIGHSCHOOL SERRA ESPAD\u00c0 SECTION - Vielca Ingenieros","og_description":"Drafting of the Basic and Execution Project that includes the renovation works in the existing building and the extension works to respond to the new functional programme of the Department of Education, Research, Culture and Sport. The built area is 8,707.31 m2. Work included the drafting of the Safety and Health Study and the following [&hellip;]","og_url":"https:\/\/www.vielca.com\/en\/proyectos\/proyecto-basico-y-de-ejecucion-de-reforma-integral-y-ampliacion-de-la-seccio-i-e-s-serra-espada","og_site_name":"Vielca Ingenieros","article_modified_time":"2026-11-17T17:08:25+00:00","og_image":[{"width":981,"height":1000,"url":"https:\/\/www.vielca.com\/wp-content\/uploads\/2022\/08\/IES-19-SG1861_1306-2-e1668068088112.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.vielca.com\/en\/proyectos\/proyecto-basico-y-de-ejecucion-de-reforma-integral-y-ampliacion-de-la-seccio-i-e-s-serra-espada","url":"https:\/\/www.vielca.com\/en\/proyectos\/proyecto-basico-y-de-ejecucion-de-reforma-integral-y-ampliacion-de-la-seccio-i-e-s-serra-espada","name":"BASIC AND EXECUTION PROJECT FOR THE COMPREHENSIVE REFORM AND EXPANSION OF THE HIGHSCHOOL SERRA ESPAD\u00c0 SECTION - Vielca Ingenieros","isPartOf":{"@id":"https:\/\/www.vielca.com\/en#website"},"primaryImageOfPage":{"@id":"https:\/\/www.vielca.com\/en\/proyectos\/proyecto-basico-y-de-ejecucion-de-reforma-integral-y-ampliacion-de-la-seccio-i-e-s-serra-espada#primaryimage"},"image":{"@id":"https:\/\/www.vielca.com\/en\/proyectos\/proyecto-basico-y-de-ejecucion-de-reforma-integral-y-ampliacion-de-la-seccio-i-e-s-serra-espada#primaryimage"},"thumbnailUrl":"https:\/\/www.vielca.com\/wp-content\/uploads\/2022\/08\/IES-19-SG1861_1306-2-e1668068088112.jpg","datePublished":"2022-08-11T07:36:57+00:00","dateModified":"2026-11-17T17:08:25+00:00","breadcrumb":{"@id":"https:\/\/www.vielca.com\/en\/proyectos\/proyecto-basico-y-de-ejecucion-de-reforma-integral-y-ampliacion-de-la-seccio-i-e-s-serra-espada#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.vielca.com\/en\/proyectos\/proyecto-basico-y-de-ejecucion-de-reforma-integral-y-ampliacion-de-la-seccio-i-e-s-serra-espada"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.vielca.com\/en\/proyectos\/proyecto-basico-y-de-ejecucion-de-reforma-integral-y-ampliacion-de-la-seccio-i-e-s-serra-espada#primaryimage","url":"https:\/\/www.vielca.com\/wp-content\/uploads\/2022\/08\/IES-19-SG1861_1306-2-e1668068088112.jpg","contentUrl":"https:\/\/www.vielca.com\/wp-content\/uploads\/2022\/08\/IES-19-SG1861_1306-2-e1668068088112.jpg","width":981,"height":1000,"caption":"ARQUITECTOS"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vielca.com\/en\/proyectos\/proyecto-basico-y-de-ejecucion-de-reforma-integral-y-ampliacion-de-la-seccio-i-e-s-serra-espada#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.vielca.com\/en"},{"@type":"ListItem","position":2,"name":"Proyectos","item":"https:\/\/www.vielca.com\/en\/proyectos"},{"@type":"ListItem","position":3,"name":"BASIC AND EXECUTION PROJECT FOR THE COMPREHENSIVE REFORM AND EXPANSION OF THE HIGHSCHOOL SERRA ESPAD\u00c0 SECTION"}]},{"@type":"WebSite","@id":"https:\/\/www.vielca.com\/en#website","url":"https:\/\/www.vielca.com\/en","name":"Vielca Ingenieros","description":"El referente en la ingenier\u00eda","publisher":{"@id":"https:\/\/www.vielca.com\/en#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.vielca.com\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.vielca.com\/en#organization","name":"Vielca Ingenieros","url":"https:\/\/www.vielca.com\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.vielca.com\/en#\/schema\/logo\/image\/","url":"https:\/\/www.vielca.com\/wp-content\/uploads\/2022\/10\/VIELCA-INGENIEROS-logotipo.png","contentUrl":"https:\/\/www.vielca.com\/wp-content\/uploads\/2022\/10\/VIELCA-INGENIEROS-logotipo.png","width":1527,"height":477,"caption":"Vielca Ingenieros"},"image":{"@id":"https:\/\/www.vielca.com\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/vielca-ingenieros-s.a.","https:\/\/www.instagram.com\/vielca_ingenieros\/"]}]}},"_links":{"self":[{"href":"https:\/\/www.vielca.com\/en\/wp-json\/wp\/v2\/proyectos\/9353","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vielca.com\/en\/wp-json\/wp\/v2\/proyectos"}],"about":[{"href":"https:\/\/www.vielca.com\/en\/wp-json\/wp\/v2\/types\/proyectos"}],"author":[{"embeddable":true,"href":"https:\/\/www.vielca.com\/en\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":2,"href":"https:\/\/www.vielca.com\/en\/wp-json\/wp\/v2\/proyectos\/9353\/revisions"}],"predecessor-version":[{"id":9544,"href":"https:\/\/www.vielca.com\/en\/wp-json\/wp\/v2\/proyectos\/9353\/revisions\/9544"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vielca.com\/en\/wp-json\/wp\/v2\/media\/5289"}],"wp:attachment":[{"href":"https:\/\/www.vielca.com\/en\/wp-json\/wp\/v2\/media?parent=9353"}],"wp:term":[{"taxonomy":"ambito_proyecto","embeddable":true,"href":"https:\/\/www.vielca.com\/en\/wp-json\/wp\/v2\/ambito_proyecto?post=9353"},{"taxonomy":"pais_proyecto","embeddable":true,"href":"https:\/\/www.vielca.com\/en\/wp-json\/wp\/v2\/pais_proyecto?post=9353"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}