IMPROVEMENT OF THE LA CURVA ROAD – NEW GUINEA – UNITED NATIONS, NICARAGUA

The project consists of the improvement of 84 km of road. The area of influence of the project is composed of the La Curva junction, the intersection of the NIC-7 and NIC-71 highways, in the department of Chontales passing through the municipality of El Coral, passing through the town of El Triunfo, in the department […]

IMPROVEMENT AND EXPANSION OF DRINKING WATER SYSTEMS IN THE CITY OF MASATEPE

The project to expand and improve the drinking water system of the city of Masatepe, is aimed at solving the current supply and installation problems affecting important sectors of the population and generating the installed capacity needed to meet the demand of the population expected at the end of the 2021-2041 design period. AP component […]

IMPROVEMENT AND EXPANSION OF THE DRINKING WATER SYSTEM OF THE CITY OF MATAGALPA

The project to expand and improve the drinking water and sanitary sewage system of the city of Matagalpa, is aimed at solving the current supply and installation problems affecting important sectors of the population and generating the installed capacity needed to meet the demand of the population expected at the end of the 2023-2043 design […]

HOSPITAL OF NUEVA SEGOVIA

VIELCA INGENIEROS S. A. is in charge of the Supervision of the Replacement Works and Equipment of the Departmental Hospital of Nueva Segovia in Nicaragua. Activities carried out under this project: Supervision (technical, economic, environmental, social and administrative) of the contractor. Monitoring of supply. Reception, installation and verification of equipment. Traducir Monitoring of compliance with […]

FINAL DESIGN OF THE WASTEWATER TREATMENT SYSTEM FOR THE CITY OF BILWI

The work carried out consisted of the drafting/elaboration of the Final Design of the Wastewater Treatment System (PTAR of Bilwi). The planned works consist of the following actions: The Bilwi PTAR has been designed for a flow of 15,769.7 m3/day; that is 164,264 inhabitants with an endowment of 120/l/day/inhabitant. As for the treatment line, it […]