RESILIENT ROADS PROGRAMME OF HONDURAS

Working field

Transport infrastructure

Client

BCIE

Ending Year

Budget

The project consists of carrying out the updating of costs, climatic and economic analyses and bases of the tender and tender for the 29.79 km Santa Rosa de Copán-Cucuyagu road, this road section has final studies and designs dating from 2015; in addition, the initial studies of technical, administrative, financial, environmental, social, climatic and economic type will be carried out at the conceptual level of the road infrastructure works of the Libramiento (Interconnector) San Pedro Sula-Occidente road of approximately 45.0 km.

The following actions were taken:

  • Field visits
  • Engineering Studies
    • Hydrological Studies
    • Geological studies
    • Analysis of Costs
    • Studies of Affectations and Expropriations
  • Geological, geotechnical and hydraulic assessment
  • Conceptual Geometric Design
  • Social and Environmental Regulations
  • Preliminary Climate Change Analysis and Co-Benefits.
  • Social analyses