MONTSERRAT, VALENCIA

BASIC AND DETAILED DESIGN OF THE NEW BRIFO BASE IN MONTSERRAT (VALENCIA)

Working field

Architecture and Urban Planning

Client

CONSORCIO PROVINCIAL DE BOMBEROS DE VALENCIA

Ending Year

2026

Budget

2.489.532,94 €

The project covers the construction of a new Forest Brigades Base (BRIFO) in the municipality of Montserrat (Valencia), on a 5,297 m² plot. The facility is designed to serve a team of approximately 20 workers and to improve the operational and functional conditions of the forest brigades of the Consorcio Provincial de Bomberos de Valencia (Valencia Provincial Fire Service Consortium).

The main building is laid out on a single storey and is organised into two distinct areas: a hangar-workshop and an administrative and staff services area.

The new base is conceived as a functional, specialised infrastructure, equipped to support forest fire prevention and response activities in the Montserrat area.

Services provided:

  • Topographic survey
  • Geological and geotechnical study
  • Preparation of the basic and detailed design
  • Preparation of the health and safety study
  • Preparation of the building services designs

FEATURED

PROJECTS