Technical assistance to the voluntary management of the project, with the following characteristics:
- lifting of the flap of the bowl, on the part affected by the damage and up to the downstream end
 - sanitation of the area to reach the rocky limestone substrate
 - infill with escollera taken with concrete up to the level of support of the slab
 - installation of passive anchors
 - concreting of a 1 m thick reinforced concrete slab
 - dismantle and clear downstream of the basin of the spillway
 - repair of the wall of the right bank with reinforced concrete
 - embankment of the area immediately downstream of the spillway
 - running wall deflector at right cashier
 



