SUPERVISION OF INFRASTRUCTURE WORKS (RENOVATIONS AND CONSTRUCTION OF HEALTH POSTS)

The project involves the technical and administrative supervision of infrastructure works aimed at strengthening the primary healthcare network through the renovation of existing buildings and the construction of new health posts in various communities across the country. These interventions are part of the national strategy to improve primary healthcare coverage, with an emphasis on rural […]
SUPERVISION OF THE DESIGN, CONSTRUCTION AND EQUIPMENT OF THE CHIQUIMULA HOSPITAL

The Sololá Hospital project (SNIP 278280) is being carried out under a turnkey contract covering design, construction, and equipping, with financing from CABEI. Supervision is provided by APCA VIELCA-CONCREMAT S.A., while construction is being undertaken by Constructora R y P, Ltda. The project consists of supervising the design, construction, and equipping phases of the turnkey […]
SUPERVISION OF INFRASTRUCTURE WORKS (RENOVATIONS AND CONSTRUCTION OF HEALTH POSTS)

The project consists of the preparation of specialized technical studies for the identification, evaluation and preliminary design of five water production systems intended to strengthen the supply in the metropolitan region of Guatemala. The objective is to guarantee the availability of reliable and sustainable water sources in the medium and long term, in response to […]
TECHNICAL SUPERVISION IN THE CONSTRUCTION OF 9,000 HOMES FOR EXTREME POVERTY THROUGHOUT NICARAGUA

Support for social and infrastructure recovery in post-disaster Nicaragua. Construction of 147 homes in the community of Haulover, municipality of Prinzapolka, RACCN – Nicaragua. Within the framework of the National Program for the Construction of Social Interest Housing, implemented by the Institute of Urban and Rural Housing, VIELCA – CONCREMAT has been entrusted with the […]
SUPERVISION OF THE REPLACEMENT AND EQUIPPING WORKS FOR THE NUEVA SEGOVIA DEPARTMENTAL HOSPITAL

VIELCA INGENIEROS S. A. is in charge of the Supervision of the Replacement Works and Equipment of the Departmental Hospital of Nueva Segovia in Nicaragua. The reference building consists of seven buildings with a total construction area of 25,134 m2 for a total of 236 beds. The departmental hospital of Nueva Segovia has an Outpatient […]
SUPERVISION OF THE IMPROVEMENT AND EXPANSION WORKS FOR THE SANITARY SEWER AND WASTEWATER TREATMENT SYSTEM IN THE CITY OF EL VIEJO, CHINANDEGA DEPARTMENT.

Technical assistance consists of reviewing and approving material specifications, reviewing hydraulic drawings, and reviewing and approving shop drawings for each of the works submitted by the CONTRACTOR, such as collectors, force mains, components of the Wastewater Treatment Plant (WWTP) and Wastewater Pumping Station (WWPS). It also includes technical consultations, coordination with the Contractor’s hydraulic specialist, […]
LAUNCH OF A WEB APPLICATION TO TRACK THE SUSTAINABILITY INDEX FOR RESTORATION, INTEGRATED INTO THE SERVERS OF THE MINISTRY OF ENVIRONMENT AND NATURAL RESOURCES OF EL SALVADOR.

Vielca developed a sustainability index for landscape restoration that systematized key indicators such as water quality, flow rates, soil conditions, landscape biodiversity, additional carbon, additional workdays, vulnerability reduction, and landscape characteristics. The application can be accessed at the following URL: https://srt.snet.gob.sv/isr/met.php
SUPERVISION OF THE CONSTRUCTION PROJECT FOR THE NATIONAL HEALTH TRAINING CENTER OF THE MINISTRY OF HEALTH OF EL SALVADOR

The Ministry of Health (MINSAL), with funding from the Korea International Cooperation Agency (KOICA), is carrying out the construction of the National Health Training Center, located on the premises of the El Salvador Hospital (formerly Pavilion 5 of the former International Fairgrounds) in the municipality and department of San Salvador. The scope of work entails […]
TECHNICAL ASSISTANCE TO THE COSTA RICAN INSTITUTE OF AQUEDUCTS AND SEWERAGE (AyA) TO PROMOTE A BUSINESS APPROACH IN THE PLANNING AND EXECUTION OF INVESTMENT PROJECTS

The project aims to strengthen AyA’s capabilities by establishing a diagnostic baseline of the AyA project formulation, planning, and management cycle process in Costa Rica, identifying internal and external bottlenecks and opportunities for improvement, primarily in the pre-investment stage and its interaction with the investment stage, to reduce timeframes and optimize resources. Type of services […]
SUPERVISION OF ROUTINE MAINTENANCE SERVICES FOR THE ROAD NETWORK LOCATED IN ZONE 10 OF EL SALVADOR

The project encompasses supervision activities for the maintenance of various paved roads in the departments of San Miguel, Morazán, and La Unión. Routine maintenance of unpaved roads comprises activities such as roadway shaping, partial replacement of the ballast layer, removal and disposal of landslides, supply and installation of flex-beam barriers, construction of concrete ditches, stone […]