DRAFTING OF THE PROJECT FOR NEW FISHING FACILITIES IN THE PORT OF VINAROZ

Detailed description of the project The project aims at the construction of facilities for the sale of fish in the port of Vinaroz and has a budget of €10,288,713.86. The main features of the project are: Green areas: With an area of 4.952.50 m2 it surrounds the following planned buildings: Warehouse for pallet trucks. Fisherman’s […]

MONITORING OF THE CONSTRUCTION OF RESIDENCES FOR THE ELDERLY

The purpose of the contract is to: On-site monitoring on a monthly basis of the implementation of the works of the elderly residences corresponding to the “Special Administrative Contract for Residential Care for Dependent Elderly People in the Valencian Community” For this purpose, VIELCA INGENIEROS S.A. has carried out the following actions: Technical control of […]

HOSPITAL OF NUEVA SEGOVIA

HOSPITAL DEPARTAMENTAL DE NUEVA SEGOVIA

VIELCA INGENIEROS S. A. is in charge of the Supervision of the Replacement Works and Equipment of the Departmental Hospital of Nueva Segovia in Nicaragua. Activities carried out under this project: Supervision (technical, economic, environmental, social and administrative) of the contractor. Monitoring of supply. Reception, installation and verification of equipment. Traducir Monitoring of compliance with […]

BASIC PROJECT AND IMPLEMENTATION OF 3 NICHES PAVILIONS IN THE CEMETERY

PABELLONES DE NICHOS EN EL CEMENTERIO

The work consisted of the Drafting of the execution project of 3 pavilions that collect approximately 300 niches of prefabricated concrete in the Onda cemetery. The work consisted of: Architectural design of niches and distribution of spaces. Calculation of structures and foundations.

REPAIR AND EXPANSION OF THE SPORTS FACILITY SKATE PLAZA

The works consisted of improving and extending the existing sports facility by equipping a new skating module and constructing two new skating areas according to the Olympic disciplines (park and pump track) and a new lighting system. The work consisted of: Architectural design of skate tracks in the “park” and “pump track” modes. Calculation of […]

DRAFTING OF THE PROJECT FOR THE CONSTRUCTION OF THE SCHOOL OF MUSIC AND DANCE

The work consisted of drafting the project for the construction of a music and dance school. The building has three floors (a basement and two above ground) and the total built area is 3,033.04 m2. The work consisted of: Architectural design of the building and distribution of the spaces. Calculation of structures and foundations. Water […]

RENOVATION OF A NEW OPERATING ROOM AT THE HOSPITAL DE LA RIBERA

The work consisted of drafting the reform project for a new operating theatre at the Hospital de la Ribera, including the equipment and facilities for air conditioning, domestic hot water, medicinal gases and electrical wiring. The total built building area is 155.53 m2. The building is in use and with all the facilities in perfect […]

SPORTS COMPLEX EL POLVORÍN

COMPLEJO DEPORTIVO EL POLVORÍN

The sports complex “EL POLVORIN” in San Salvador. This project is part of the transversal axes of the National Sports Institute for the recovery of the sports infrastructure at the national level. This project envisages the rescue and improvement of the current buildings and sports fields as well as the construction of buildings that meet […]

GENERAL URBAN DEVELOPMENT PLAN OF TORAS

The municipality of Torás is located in the region of Alto Palancia, in the province of Castellón. The area delimited as Urban Land has been fixed at 248,207 m2 and Non-Developable Land at 16,536,823 m2. The work carried out consisted of the drafting of the General Plan of the Municipality, which incorporated the following works: […]