HONDURAS

SUPERVISION OF THE DESIGN, CONSTRUCTION, EQUIPPING, AND COMMISSIONING OF THE NEW SAN ISIDRO FACILITY IN TOCOA, HONDURAS

Working field

Architecture and Urban Planning

Client

SECRETARIA DE SALUD (SESAL)

Ending Year

2026

Budget

5,498,346.90 USD

The project involves supervising the design, construction, equipping, and commissioning of the new San Isidro Hospital in Tocoa, Honduras. It is located in the municipality of Tocoa, Department of Colón, on a site covering 27,912.00 m² equivalent to 4 mz

The project is being developed using the fast-track methodology under a turnkey contract.

The healthcare facility will consist of two levels with a total construction area of ​​10,500.00 m² and a capacity of 118 beds, comprising 108 census beds and 10 non-census beds.

The hospital will feature the following service areas:

  • Emergency (adult and pediatric)
  • Internal medicine
  • Surgical Suite (3 Operating Rooms)
  • Medical Imaging: CT Scan, X-ray, Mammography, Ultrasound, Cardiology, and General Ultrasound.
  • Hospitalization: Surgical, Pediatric, and Gynecology-Obstetrics
  • Intensive Care Unit
  • Gynecology and Obstetrics
  • Outpatient Consultations and Ambulatory Services
  • Laboratory and Blood Bank
  • Medical Residency
  • Family Shelter
  • Heliport

Type of services provided

Control and Monitoring:

  • Supervision of the project’s design phase.
  • Supervision of the project execution phase.
  • Supervision of the Project’s Equipment Phase.
  • Supervision of the commissioning phase.

Drafting of documentation:

  • Preparation of weekly, monthly, and quarterly progress reports on the activities carried out.

FEATURED

PROJECTS