FINAL TREATMENT FACILITY FOR SHIP-GENERATED AND ASSIMILABLE LIQUID WASTE (MARPOL)

The purpose of the project is the construction of a final treatment facility for ship-generated liquid waste (Marpol 73/78 Annex I) and other assimilable liquid waste authorized by the Valencia Port Authority and the treatment of industrial water into aqueous solutions. The processes have been designed for ship-generated liquids so that the final product meets […]

OBRAS PARA LA REUTILIZACIÓN DE AGUAS RESIDUALES DEPURADAS EN LA ALBUFERA SUR

Descripción detallada del proyecto La depuradora ya existente recoge las aguas residuales de los cascos urbanos de Alginet, Almussafes, Benifaió y Sollana, y de sus polígonos industriales, resultando una infraestructura esencial para el buen estado ecológico del Parque Natural de L’Albufera de Valencia. Dicha EDAR está proyectada para servir a 199.000 habitantes equivalentes, con un […]

AMPLIACION CON TRATAMIENTO TERCIARIO DE LA EDAR DE QUART-BENAGER

Descripción detallada del proyecto Las obras ejecutadas consisten en la ampliación de la EDAR Quart-Benáger, de modo que se incorpora a la misma un tratamiento terciario para el caudal de diseño, 60.000 m3/d.(300.000 hab-eq) Las obras han consistido en: Intercepción del agua de salida de los decantadores secundarios antes de su paso a la desinfección; […]

SOLID WASTE RECYCLING AND COMPOSTING PLANT AND CONTROLLED WASTE LANDFILL IN ELCHE

The project consists of the construction of a recycling and composting plant for an equivalent population of 325,490 inhabitants and has a budget of approximately €9,308,759.87. The main features of the work are: 50,000 m3 of excavations and 35,000 m3 of landfills. Paving of urban areas with 14.300 m2 of concrete for reinforcement and 65 […]

IMPROVEMENT OF FONT DE LA PEDRA WASTE WATER TREATMENT PLANT

Detailed description of the project Due to the inability of the current plant to treat both the incoming flow and the high pollutant load (discharges from textile industries and mills), the existing facilities need to be renovated/expanded. Furthermore, due to the advanced state of eutrophication in which the Beniarrés reservoir is located, to which the […]

EXTENSION OF ALTEA, CALLOSA D’EN SARRIA, POLOP DE LA MARINA AND LA NUCÍA WWTP

The expansion works of the WWTP consist of the implementation of a new pretreatment, primary settling and biological treatment with nitrification-denitrification, secondary settling, aerobic digestion, thickening and drying of sludge. It has also acted on the equipment and the repair of the civil works of the apparatuses of the existing plant.

MANAGEMENT OF IMPROVEMENT WORKS AT THE TORREVIEJA WASTEWATER TREATMENT PLANT

Detailed description of the project Since the start of operation of the WWTP in 1982 and subsequent extensions, the inlet flows have continued to increase, due to the population growth, especially during the summer season, reaching now, to equalize during the summer months, the design flows of the plant. It is therefore necessary to extend […]

CONSTRUCTION AND COMMISSIONING OF THE FACILITIES OF THE VALENCIA INTERIOR CONSORTIUM

The project consists of the construction of the recycling and composting and disposal facilities of the Zonal Solid Waste Plan of Zones VI, VII and IX of the Valencian Community and has an approximate budget of 74,064,065,21 €. The main features of the work are: Mass-collected municipal waste transfer stations, including the transport of waste […]

DRINKING PLANT LAS PAVAS

A comprehensive technical study has been carried out to define short- and medium-term action for the rehabilitation of the raw water catchment works and each of the unitary processes of the drinking water treatment plant in Las Pavas, El Salvador. This makes it possible to improve the conditions of collection, treatment and operation once the […]