SUPERVISION OF THE DESIGN, CONSTRUCTION AND EQUIPMENT OF THE HOSPITAL OF SOLOLÁ

DETAILED DESCRIPTION OF THE PROJECT TYPE OF SERVICES PROVIDED DETAILED DESCRIPTION OF THE PROJECT The project consists of the Supervision of the design, construction and equipment of the turnkey contract for the improvement of the hospital of Solola. Fast-track mode. Phase 1 PRE INVESTMENT, PHASE 2 INFRASTRUCTURE AND PHASE 3 FURNITURE AND EQUIPMENT: Phase 1 […]

SUPERVISION OF THE DESIGN, CONSTRUCTION AND EQUIPMENT OF THE CHIQUIMULA HOSPITAL

DETAILED DESCRIPTION OF THE PROJECT TYPE OF SERVICES PROVIDED DETAILED DESCRIPTION OF THE PROJECT The project consists of supervising the design, construction and equipment of the turnkey contract for the improvement of the Chiquimula hospital. Fast-track mode. Phase 1 PRE INVESTMENT, PHASE 2 INFRASTRUCTURE AND PHASE 3 FURNITURE AND EQUIPMENT: Phase 1 PRE-INVERSION: Technical studies […]

BASIC AND IMPLEMENTATION PROJECT OF THE NEW FOREST BRIGADE BASE IN ADEMUZ

Basic and execution project for the construction of a new building to be based on the Forest Brigades of the Provincial Consortium of Firefighters of Valencia (CPBV) in the municipality of Ademuz. The facility consists of a single floor in which two zones are distinguished: hangar/workshop and administrative area. The requirements program includes the use […]

FINAL TREATMENT FACILITY FOR SHIP-GENERATED AND ASSIMILABLE LIQUID WASTE (MARPOL)

The purpose of the project is the construction of a final treatment facility for ship-generated liquid waste (Marpol 73/78 Annex I) and other assimilable liquid waste authorized by the Valencia Port Authority and the treatment of industrial water into aqueous solutions. The processes have been designed for ship-generated liquids so that the final product meets […]

WORKS FOR THE REUSE OF TREATED WASTE WATER IN THE SOUTHERN ALBUFERA

Detailed description of the project The existing treatment plant collects wastewater from the urban centres of Alginet, Almussafes, Benifaió and Sollana, and from their industrial estates, resulting in an essential infrastructure for the good ecological status of the Natural Park of L’Albufera de Valencia. This WWTP is designed to serve 199,000 equivalent inhabitants, with a […]

ENLARGEMENT WITH TERTIARY TREATMENT OF QUART-BENAGER WWTP

Detailed description of the project The works carried out consist of the extension of the Quart-Benáger WWTP, so that a tertiary treatment for the design flow, 60,000 m3/d (300,000 inhab-eq) is incorporated into it. The works have consisted of: Interception of the outlet water of the secondary decanters prior to its passage to disinfection; diverting […]

SOLID WASTE RECYCLING AND COMPOSTING PLANT AND CONTROLLED WASTE LANDFILL IN ELCHE

The project consists of the construction of a recycling and composting plant for an equivalent population of 325,490 inhabitants and has a budget of approximately €9,308,759.87. The main features of the work are: 50,000 m3 of excavations and 35,000 m3 of landfills. Paving of urban areas with 14.300 m2 of concrete for reinforcement and 65 […]

IMPROVEMENT OF FONT DE LA PEDRA WASTE WATER TREATMENT PLANT

Detailed description of the project Due to the inability of the current plant to treat both the incoming flow and the high pollutant load (discharges from textile industries and mills), the existing facilities need to be renovated/expanded. Furthermore, due to the advanced state of eutrophication in which the Beniarrés reservoir is located, to which the […]

EXTENSION OF ALTEA, CALLOSA D’EN SARRIA, POLOP DE LA MARINA AND LA NUCÍA WWTP

The expansion works of the WWTP consist of the implementation of a new pretreatment, primary settling and biological treatment with nitrification-denitrification, secondary settling, aerobic digestion, thickening and drying of sludge. It has also acted on the equipment and the repair of the civil works of the apparatuses of the existing plant.