Menu

KOGO DISTRICT, GUINEA ECUATORIAL

BRIDGES AND REINFORCED CONCRETE WORKS ON THE NCOAMBENG-MIBONDE-ELON SECTION OF RAILWAY

Working field

Structural Design

Client

DESARROLLO Y PROMOCIONES PROALSO, S.L.

Ending Year

2018

Budget

9.096.554,37 €

Design of three road bridges with cantilevered pedestrian walkways and two reinforced concrete works for vehicle passage, projecting two 3.5 m wide lanes. The project includes the following:

  • Factory work 1: 11 metres of light, two holes of 4.75×3.5 m, 0.5 metres of thickness in strips and slabs
  • Factory work 2: 6 meters of light, with dimensions of 5×4 meters, 0.5 meters of thickness in strips and slabs
  • Bridge over the Mitong River: isostatic metal lattice of intermediate panel on reinforced concrete piles. Light of 102.33 meters distributed in 4 compartments.
  • Bridge over the Toche River: isostatic metal lattice of intermediate panel on reinforced concrete piles. Light of 39,642 meters of a single span
  • Bridge over the Mitemele River: isostatic metal lattice of intermediate panel on reinforced concrete piles. Light of 77,364 meters distributed in 3 spaces.

FEATURED

PROJECTS