Menu

BENIFASSA, CASTELLÓN

MANAGEMENT OF THE CONSTRUCTION WORK FOR THE AUXILIARY MEDICAL CENTRE OF THE POBLA DE BENIFASSA

Working field

Architecture and Urban Planning

Client

CONSELLERIA DE SANITAT UNIVERSAL

Ending Year

2016

Budget

223.185,29 €

Detailed description of the project

The works consist of the construction of an auxiliary medical centre in the Pobla de Benifassa, Castellón.

The area of the Project has a total usable area of 239.18 m2 divided into the basement, which contains the garage and storage room; the ground floor, which is the public consultation area; and the first floor, which remains as a reserve space. It is a building between partitions, with a plot area of 93.40 m2. It has no exterior urbanization.

The Clinic has the following facilities:

  • 1 floor dedicated to consultation, having a medical and nursing consultation.
  • 1 reserve plant to carry out in the future a rest area for doctors.

The budget for the physical implementation of the project amounts to €195,552.16. The total budget of the planned work reaches the amount of 223,185,29€, which includes overheads, industrial profit and VAT.

This Total Project Budget is broken down as follows:

  • Architectural works: 160.524,13 €
  • Facilities: €54,548,21
  • Equipment: €3,836,26
  • Safety and Health: €4,276.56

Type of services provided

Description of services :

  • Topographic survey.
  • Construction and execution management:
    • Review of the Implementation Project.
    • Geometric, Execution and Materials Control.
    • Control of the implementation of facilities.
    • Control of Equipment and Suppliers.
    • Follow-up to the Programme of Work.
    • Quality Control.
    • Economic Control, Measurements and Certifications.
    • Preparation of Reports.
    • Health and Safety Coordination.
  • Environmental monitoring.
  • Creation of drawings As built

FEATURED

PROJECTS