LA SAFOR, VALENCIA, SPAIN

MODERNISATION OF IRRIGATION IN THE MUNICIPALITIES OF SIMAT, BENIFAIRÓ AND TAVERNES DE LA VALLDIGNA

Working field

Hydraulics and water treatment

Client

CONSELLERÍA DE MEDIO AMBIENTE, AGUA, URBANISMO Y VIVIENDA

Ending Year

2008

Budget

11.500.000,00 €

Description of the project

The project consisted of modernising the irrigation method in the area of the municipalities of Simat, Benifairó and Tavernes de la Valldigna, located in the Comarca de la Safor (Valencia). The planning for the localized irrigation of this area has been thought of based on the construction of two reservoirs for collecting water from sources and wells. These reservoirs are the Clot reservoir, at elevation 30, which will be a reservoir; and the Mosaira reservoir, at elevation 92, which will collect water from the wells with the highest elevation. In the two ponds, pumping with variable frequencies has been planned that will give enough pressure to be able to reach the highest level of the estate, reaching these with the necessary pressure to establish the drip irrigation system. In this project we finished the network at the filtration and fertilizer heads, being the responsibility of the Community of Irrigators to carry the water from the aforementioned heads to each of the user’s plots.

The main elements of the networks covering the irrigation area are:
– Network 1:
Balsa de Clot, en vaso de tierra. (V = 78.000 m3)
Clot-Cota 150 pumping, with variable frequency (Q= 107,5 l/sg at 120 m.a.c.)
– Network 2:
Balsa de Clot, en vaso de tierra. (V = 78.000 m3)
Clot-Cota 100 pumping with variable frequency (Q= 361.1 l/sg at 75 m.a.c.)
Community cola raft, reinforced concrete. (V = 4.000 m3)
Pipe that connects the Rafts with the Filtration and Fertilizer heads.
– Network 3:
Mosaira raft, made of reinforced concrete. (V = 10.000 m3)
Mosaira pumping with variable frequency (Q= 357,5 l/sf at 60 m.a.c.)
Pipe connecting the Mosaira Raft with the Filtration and Fertilizer heads.

Type of services provided

Preliminary studies and drafting of the irrigation modernization project in the region, including the corresponding Environmental Impact Study.
Study and diagnosis of existing networks
Drafting of the Draft
Memory and Annexes
Plans
Specification of Technical Requirements
Budget
Safety and Health Study