Menu

TORREBLANCA, CASTELLÓN

URBAN ADAPTATION PROJECT OF SECTORS IV, VII, VIII, IX AND X IN TORREBLANCA

Working field

Transport infrastructure

Client

AIU DOÑA BLANCA GOLF DE TORRENOSTRA

Ending Year

2019

Budget

43.322.090,31 € (PEM)

Design and Drafting of the Construction Project, as well as advice on the administrative approval procedures for both urban planning and environmental sectors IV, VII, VIII, IX and X of Torreblanca, whose total surface area is 1,911,917 m².

The work carried out was as follows:

  • Definition of the layout and dimensioning of firm surfaces and pavements of roads, sidewalks and bike lanes.
  • Sanitation, water supply and rainwater networks.
  • Lighting networks, low-voltage, medium-voltage power lines and transformation and telecommunications centres.
  • Structures of several walkways.
  • Design of green areas and irrigation networks.
  • Urban equipment and furniture.
  • Design promenade of the coast
  • Project for wastewater treatment plant and collectors.
  • Electricity supply project from the future substation.

FEATURED

PROJECTS