The work consisted of drafting the implementation project for the construction of a children’s classroom together with the urbanization works that include the creation of the playground space. The total built area of building is 465.50 m2.
The work consisted of:
- Architectural design of the building and distribution of the spaces.
 - Calculation of structures and foundations.
 - Water Receiving Facility (Plumbing and Sanitation).
 - Installation of air conditioning, ventilation and ACS.
 - Electrical facilities.
 - Telecommunications facilities.
 - Fire protection equipment.
 - Gas facilities.
 - Acoustic study.
 
