Nicaragua

SUPERVISION OF THE IMPROVEMENT AND EXPANSION WORKS FOR THE SANITARY SEWER AND WASTEWATER TREATMENT SYSTEM IN THE CITY OF EL VIEJO, CHINANDEGA DEPARTMENT.

Working field

Architecture and Urban Planning

Client

Empresa Nicaraguense de Acueductos y Alcantarillados (ENACAL)

Ending Year

2026

Budget

--

Technical assistance consists of reviewing and approving material specifications, reviewing hydraulic drawings, and reviewing and approving shop drawings for each of the works submitted by the CONTRACTOR, such as collectors, force mains, components of the Wastewater Treatment Plant (WWTP) and Wastewater Pumping Station (WWPS). It also includes technical consultations, coordination with the Contractor’s hydraulic specialist, and reviewing all types of documentation submitted by the Contractor to External Supervision regarding the project’s hydraulics. A second stage involves on-site review of the work execution to ensure compliance with and application of all approved documents.

Similar work has been carried out between 2022 and 2025 in the following Nicaraguan cities: El Viejo (Chinandega); Telica (León); Matagalpa (Matagalpa); San Jorge and Rivas (Rivas); Diriamba (Carazo); and the La Primavera neighborhood (Managua).

FEATURED

PROJECTS