SUPERVISION OF THE DESIGN, CONSTRUCTION AND EQUIPMENT OF THE CHIQUIMULA HOSPITAL

Working field

Architecture and Urban Planning

Client

Ministerio de Salud Pública y Asistencia Social (MSPAS) – Unidad Especial de Ejecución de Programas y Proyectos de Salud (UEPPS)

Ending Year

2027

Budget

33,833,502.83 USD

The Sololá Hospital project (SNIP 278280) is being carried out under a turnkey contract covering design, construction, and equipping, with financing from CABEI. Supervision is provided by APCA VIELCA-CONCREMAT S.A., while construction is being undertaken by Constructora R y P, Ltda.

The project consists of supervising the design, construction, and equipping phases of the turnkey contract for the upgrade of the Sololá Departmental Hospital, utilizing a fast-track delivery method and divided into three main phases:

Phase 1 PRE-INVESTMENT:Includes technical studies, finalization of architectural and structural designs, design of all necessary specialized systems (plumbing and sanitation, electrical, mechanical, telecommunications, air conditioning, medical gases, vertical transport, among others), as well as medical equipment planning.

Phase 2 CONSTRUCTION: Comprehensive supervision of the construction of a five-story hospital featuring a 240-bed capacity, a helipad, and specialized medical areas. Quality of work, compliance with technical and legal specifications, schedule control, material certification, and verification of construction milestones are ensured.

Phase 3 MEDICAL EQUIPMENT: Validation and certification of the installation of fixed and mobile medical equipment, authorizing changes that enhance functionality. The equipment phase will take place in 2026, and the hospital is expected to be fully operational by mid-2027.

Type of services provided

Supervision of Construction:

  • Construction supervision.
  • Administrative Project Management (Control and Approval of Valuations)
  • Management of permits with public institutions (CONRED, MARN, MSPAS, municipality, etc.).
  • Verification of compliance with technical specifications.
  • Monitoring of the physical and financial progress of the project.
  • Environmental supervision (EMP) and occupational health and safety (OHS) measures.
  • Verification of construction schedules and contractual deadlines.
  • Preparation of weekly and monthly technical reports for the owner.

Role of Vielca:

  • Comprehensive technical supervision:
  • Control of infrastructure, quality, schedules, occupational health, and the environment.
  • Verification and installation of medical equipment.
  • Management and support for permits and certifications.