Menu

COMUNIDAD VALENCIANA, SPAIN

ACCESS ROUNDABOUT TO BENIFAIÓ

Working field

Transport infrastructure

Client

DIPUTACIÓN DE VALENCIA

Ending Year

2008

Budget

518.149,46 €

The tasks carried out included:

The works involved the construction of a roundabout on the CV-520 road, at the entrance to the Jaume I industrial estate in Benifaió, with the aim of controlling traffic speed and efficiently regulating road traffic. The roundabout has an internal diameter of 20 m, with a ring road of 8 m and flanks of 0.50 m. Four access branches converge to the roundabout. Two of them correspond to the entrance and exit lanes of the CV-520 itself. A third access branch has been made to coincide with the existing entrance road to the Jaume l industrial estate. The fourth branch corresponds to the connection with the Carnino Passet and the access road to the Tower of Mussa.

In addition, the existing service road next to the road has been remodelled, so that the secondary roads of the industrial estate are channeled to the roundabout, avoiding their direct incorporation into the road.

The work has been completed with the ornamentation of the roundabout and its surroundings, in order to dignify access to the population and to highlight the high symbolic value of the surroundings in which the roundabout is located, located in the protected area of the Tower of Mussa, an asset of Cultural Interest according to the Spanish Historical Heritage Act (BIC).

FEATURED

PROJECTS