Menu

NITRATES AIDIMME

Participants: Instituto Tecnológico Metalmecánico, Mueble, Madera, Embalaje y Afines (AIDIMME), ANALAQUA, S.L. and Vielca Ingenieros, S.A. Summary: The project aims to develop electrocatalysis technology to transform nitrates contained in drinking water into harmless components and feedstock for fertilizer formulation, within a circular economy context. To this end, it will develop a sequential working methodology, which […]

IMPROVEMENT OF THE SAFETY OF FACILITIES AND ACCESS TO THE ARENÓS DAM

presa arenos

The work carried out consisted of providing technical assistance to the voluntary management of the works. The main features are: Improvement of access roads and dam interiors Upgrading of dam tunnels, wells and chambers Signalling and marking of the facilities, considering the installation of six barriers for vehicles Construction of a new access bridge to […]

EXPANSION OF WASTE LANDFILL AT THE MSW TREATMENT PLANT IN ELCHE

vertedero elche

The work involved supervising and inspecting the construction works of a discharge cell of 279,889 m3 gross capacity (201,520.08 net reject tons) for an estimated duration of 24 months. The main features of the works are: Conditioning of stage I of cell 2: excavation of 45,099 m3 at the bottom of the pouring vessel. Filling […]

CELL II – PHASE II AND SEALING OF CELL I OF THE ELX LANDFILL

VERTEDERO DE ELX

Implementation of phase ii of cell ii of the non-hazardous waste landfill of els cremats in elx (alicante), according to the specific specifications of the integrated environmental permit to eliminate rejects from the existing municipal solid waste recycling and composting plant. cell ii has a total area of 119,315.73 m3 and will be operated with […]

REGULATING DAM FOR IRRIGATION FOR THE ROYAL MONCADA DITCH IN THE PUÇOL RIVER T.M.

regadios pusol

Technical assistance to the optional management of the works consisting of a reservoir for regulating and storing water for irrigation of reinforced concrete with dimensions of 55×160 m, with a total capacity of about 32,500,00 m3, to optimize the use of water coming from the real canal of Moncada and guarantee an efficient supply of […]

EMERGENCY WORKS AND REPAIR OF MARIA CRISTINA DAM RELIEF

presa maria cristina

Technical assistance to the voluntary management of the project, with the following characteristics: lifting of the flap of the bowl, on the part affected by the damage and up to the downstream end sanitation of the area to reach the rocky limestone substrate infill with escollera taken with concrete up to the level of support […]

NEW OLIVA-NORTE WWTP

edar oliva

Drafting of the above-mentioned project which includes the following infrastructures: Pulse conduction of regenerated water, with a total length of approximately five kilometres, for the transport of effluent from the new WWTP to a control tank with a capacity of approximately thirty thousand cubic metres. Network of wastewater collectors, with a total length of approximately […]

CHESTE-CHIVA WWTP (VALENCIA) AND GENERAL COLLECTORS

edar

Drafting of the project for the new sewerage pipeline system and the construction of a new WWTP. Main features of the sewerage pipe system: 7,813 meters of gravity conduits, HDPE pipes of different diameters ranging from DN630 to DN315. 12,618 meters of conduits in drives, HDPE pipes of different diameters ranging from DN500 to DN250. […]