Menu

CONSERVATION ACTIVITIES IN THE JÚCAR BASIN

cuenca jucar

Analyze the possible actions to be carried out through a diagnosis of the situation and/or problem, the definition and economic evaluation of the work to be carried out, as well as the environmental analysis of its execution. Control and supervision on site and in the technical office of the execution of the previously defined actions. […]

GENERAL COLLECTOR OF COCENTAINA DE FONT DE LA PEDRA (ALICANTE)

colector cocentaina

Direction of the works with the following characteristics: Cocentaina collector: conditioning of the access area to the ravine of fraga. cleaning of the Concentain collector. treatment of leaks by means of a continuous resin sleeve. reconstruction of the bottom of the well fr01. General collector Font de la Pedra: treatment of leaks with continuous sleeve […]

NON-HAZARDOUS WASTE LANDFILL IN ELCHE

cremats

Supervision and inspection of the construction works of a waste cell, belonging to the Baix Vinalopó consortium, with a gross capacity of 596,167 m3 (429,240,27 tonnes net of rejections), for an estimated duration of 52 months. The main features of the work have been: Excavation of 68.025 me at the bottom of the pouring cup. […]

DEODORIZATION OF THE MUNICIPAL WASTE TREATMENT PLANTS OF THE VALDEMINGÓMEZ TECHNOLOGICAL PARK

TRATAMIENTO DE RESIDUOS

Design and drafting of 5 projects that consisted of the identification of technical improvements available for the minimization of odors of municipal solid waste treatment systems and biomethanization plants integrated in the technology park of Valdemingómez. The measures developed are based on improving the watertightness of vessels, increasing the number of hourly air renewal in […]

SPORTS PAVILION TYPE C

pabellon cenizate

DRAFTING OF THE PROJECT AND DIRECTION OF THE WORKS. According to the needs program provided by the property, it is intended to build a covered pavilion, with a multi-sport court able to be used for the following sports: basketball, handball, volleyball, tennis and indoor soccer. The dimensions and characteristics of the track will meet the […]

WWTP OF PINET (VALENCIA)

edar pinet

Drafting of the preliminary project for construction and operation of the station for a flow of 70 m3/day, 583 h-e, treatment: solid medium-biodiscs

WWTP OF BARXETA (VALENCIA)

edar barxeta

Drafting of the preliminary project for construction and operation of the station for a flow of 600 m3/day, 3,000 h-e, treatment of activated sludge, prolonged aeration.

WWTP OF OLIVA

edar oliva

Drafting of the preliminary project of the station for a flow of 17,000 m3/day, 70,833 h-e, treatment of activated sludge, prolonged aeration.

WWTP OF GANDÍA AND SOUTHERN ZONE OF SAFOR (VALENCIA)

edar gandia

Technical assistance to the construction management for the diagnosis and design of the station, with the following characteristics: flow rate of 60,000 m3/day and 143,000 h-e; primary treatment; secondary treatment (using activated sludge); physico-chemical treatment (lamellar decantation); disinfection; chlorination; anaerobic digestion of sludge and biogas line.