BATTERY CELL GIGAFACTORY OF POWERCO BATTERY SPAIN SAU IN SAGUNTO
Strategic Territorial Project (PTE). It is an urban planning instrument that aims to organize, manage and develop territorial intervention of unique business initiatives with a high impact, in terms of the generation of income and employment. Vielca drafted all the required technical documentation and the PTE was approved by agreement of the Council of the […]
CONSERVATION ACTIVITIES IN THE JÚCAR BASIN
Analyze the possible actions to be carried out through a diagnosis of the situation and/or problem, the definition and economic evaluation of the work to be carried out, as well as the environmental analysis of its execution. Control and supervision on site and in the technical office of the execution of the previously defined actions. […]
CONSERVATION AND IMPROVEMENT OF THE STATE OF THE HYDRAULIC PUBLIC DOMAIN OF THE VALENCIAN COMMUNITY AND TERUEL
Analyze the possible actions to be carried out through a diagnosis of the situation and/or problem, the definition and economic evaluation of the work to be carried out, as well as the environmental analysis of its execution. Control and supervision on site and in the technical office of the execution of the previously defined actions. […]
ENVIRONMENTAL RESTORATION PROJECT OF THE AMADORIO RIVER
Detailed description of the project The works consist of the environmental upgrading of a stretch of the Amadorio River between the railway bridge and the sea, with a length of approximately 560 m and a budget of € 3,656,025. The solution adopted consists of the following actions: – Demolition of buildings in precarious condition, with […]
ENVIRONMENTAL RESTORATION OF THE MAGRO RIVER BED FROM CAUDETE DE LAS FUENTES TO FORATA RESERVOIR
The works are developed from Caudete de las Fuentes to the Forata Reservoir, in an approximate length of 11 km and with a budget of 2,580.226.07 €. The region through which the Magro River flows in the reference section is mainly agricultural, with a preponderance of grape cultivation and livestock holdings. It includes important towns […]
ENVIRONMENTAL IMPROVEMENT OF THE OJOS DE MOYA RIVER AS IT PASSES THROUGH MIRA (CUENCA)
The project consisted mainly of the management of the roads adjacent to the riverbanks, including the construction of a perimeter wall, as well as the rehabilitation of the riverbanks for public use and the adaptation of the riverbed. The measures carried out extend over a stretch of 1,500 m in length and with an average […]
PROJECT OF RESTORATION OF HABITATS AND ADAPTATION FOR PUBLIC USE AT THE MOUTH OF THE POYO
The works are aimed at the environmental adequacy of the aquatic ecosystems present in the area and have a budget of approximately €1,388,260.54. The objectives of the actions are: Favour the development of biological communities, enhancing the recovery of endangered species in these environments. Promote the educational use of the space created, providing it with […]
ACTIONS FOR THE IMPROVEMENT OF THE TANCAT DE LA PIPA
The project consisted of setting up a green filter in the middle of the Natural Park of the Albufera de Valencia, with the aim of collecting water from the Barranco del Poio and the Canal del Puerto de Catarroja, in order to purify it before returning it to the Lake of the Albufera. Maintenance elements […]
ECONOMIC EVALUATION OF THE COST-EFFECTIVENESS OF THE FORESTRY ACTIONS OF THE PILOT FARMS OF THE LIFE+BOSCOS PROJECT
The LIFE+BOSCOS Project focuses on forest ecosystem governance demonstration actions for proper adaptation to climate change. Nine actions were implemented with multifunctional objectives: Maintain the agroforestry mosaic (currently in the process of agricultural abandonment). Increase the specific and structural biodiversity of forest ecosystems. Increase the vigour of forest masses to cope with the climate change […]
FOREST RESOURCES MANAGEMENT PLAN FOR THE FOREST DEMARCATION OF VALL D’ALBA IN CASTELLON.
The Forest Resources Management Plan carries out an analysis and diagnosis of environmental services (both forest production and flood regulation services, erosion control, etc.), including a market analysis of these services, and includes the management of uses in the demarcation, delimiting areas of action to maintain and improve these services. The area of the demarcation […]