FLOODABILITY STUDY OF THE DOÑA BLANCA GOLF URBANIZATION

A Floodability Study of the San Miguel River and areas with geomorphological hazards due to the formation of wetlands was carried out in the Doña Blanca Golf de Torreblanca urbanization. To this end, the following processes were carried out: Development of a detailed Floodability Study, which contained the following documentation: Pseudo-distributed hydrological study in Hec-HMS […]

RIVER HYDRAULICS STUDY ON PETROLEUM EXTRACTION IN THE JIBOA RIVER

The main features of the project are: Field work to determine: Topographic survey, based on photogrammetric restitution of flight drone of 10 km of channel with an average width of 300 m and mooring to the geodetic network with complementary triangulation by means of total station. Processing of the national UDAR flight of 2×2 m […]

HYDROLOGICAL AND HYDRAULIC STUDY TO MEET PATRICOVA AND CHJ REQUIREMENTS

The work carried out by Vielca Ingenieros consisted in responding to the reports of PATRICOVA and CHJ on the danger of flooding of the plot to be developed in the western sector of Villareal, in which a detailed study was given according to the aforementioned requirements of the channels: Barranc del Esbarzers. Barranc del Ràtils. […]

UPDATE OF THE LLIRIA SUPPLY MASTER PLAN

The work consisted of the Development of the Supply Master Plan for the Management of the Municipal Potable Water Supply Service of the Municipality. At the same time, the modeling of the supply network was carried out using the EPANET software. The design population for the scenario was 22,648 inhabitants and that of the future […]

DEMARCATION OF THE HYDRAULIC PUBLIC DOMAIN IN THE BARRANC DEL MALET AND THE VACA RIVER

The project consisted of the following work: Cartography and topographic surveys at a scale of not less than 1:1000; management of rainfall information. Hydrological and hydraulic studies, application of mathematical models, other studies. List of adjacent owners and preparation of cadastral plans. Processing of public information ; including payment of advertisements, settlement of claims. Management […]

FINAL DESIGN OF THE WASTEWATER TREATMENT SYSTEM FOR THE CITY OF BILWI

The work carried out consisted of the drafting/elaboration of the Final Design of the Wastewater Treatment System (PTAR of Bilwi). The planned works consist of the following actions: The Bilwi PTAR has been designed for a flow of 15,769.7 m3/day; that is 164,264 inhabitants with an endowment of 120/l/day/inhabitant. As for the treatment line, it […]

DAMPING OF MACRO RAIN DRAINAGE

This project of damping works of the macro storm drainage in the Metropolitan Area of San Salvador (AMSS) establishes the development of lagoons and SUDS as the proposal to mitigate the effects of river flooding in the urban area. Criteria are presented: economic-financial, socio-political, environmental and hydrological-hydraulic; to limit the typology and location. The joint […]

MASTER PLAN FOR RAINWATER MANAGEMENT

PLAN MAESTRO PARA LA GESTIÓN DE AGUAS

The Master Plan for the Sustainable Management of Rainwater in the Metropolitan Area of San Salvador (AMSS) was created with the fundamental objective of establishing the actions necessary for the proper functioning of rainwater drainage in the AMSS. The work carried out consisted of drafting the referenced project for the Lamination Dams called “Colonia Luz”, […]