SANITARY SEWERAGE SYSTEM OF THE CITY OF MATAGALPA

The project to expand and improve the sanitary sewerage system is aimed at solving the current deficit situation and providing the city of Matagalpa with a drinking water and sanitary sewerage system with the necessary capacity to meet the demand of the population expected by the end of the design period 2023 – 2043. The […]
STUDY OF MOBILITY AND DEMAND FOR PUBLIC TRANSPORT IN THE CITY OF MANAGUA

The project will be developed in the capital city of the Republic of Nicaragua, Managua, under three types of areas of influence: study area, planning area and project location area. As part of the scope of the project, it is to carry out a conceptual, functional and operational design, including a study of the relocation […]
CENTRALIZED AND INTEGRATED MOBILITY MANAGEMENT SYSTEM IN EL SALVADOR

The project consists of supervising the supply and implementation of the mobility management system through the installation and technology transfer of both software and hardware, training and/or training in the use of the equipment installation, the creation of manuals, diagrams, technical specifications and all the information necessary for the installation, implementation, maintenance and operation of […]
RESILIENT ROADS PROGRAMME OF HONDURAS

The project consists of carrying out the updating of costs, climatic and economic analyses and bases of the tender and tender for the 29.79 km Santa Rosa de Copán-Cucuyagu road, this road section has final studies and designs dating from 2015; in addition, the initial studies of technical, administrative, financial, environmental, social, climatic and economic […]
NITRATES AIDIMME

Participants: Instituto Tecnológico Metalmecánico, Mueble, Madera, Embalaje y Afines (AIDIMME), ANALAQUA, S.L. and Vielca Ingenieros, S.A. Summary: The project aims to develop electrocatalysis technology to transform nitrates contained in drinking water into harmless components and feedstock for fertilizer formulation, within a circular economy context. To this end, it will develop a sequential working methodology, which […]
VERIFICATION OF THE FUNCTIONING AND SUSTAINABILITY OF THE URBAN WATER SYSTEM IN THE MUNICIPALITY OF RAXRUHÁ

The evaluation was carried out by conducting fieldwork guided by a survey in which the following aspects of relevance were defined: Operation of the system: State of infrastructure. Volume of water produced and served by the system. Endowment per user and per day. Hours of daily service. Quality of the water offered, evaluated from the […]
BRIDGES AND REINFORCED CONCRETE WORKS ON THE NCOAMBENG-MIBONDE-ELON SECTION OF RAILWAY

Design of three road bridges with cantilevered pedestrian walkways and two reinforced concrete works for vehicle passage, projecting two 3.5 m wide lanes. The project includes the following: Factory work 1: 11 metres of light, two holes of 4.75×3.5 m, 0.5 metres of thickness in strips and slabs Factory work 2: 6 meters of light, […]
CONSTRUCTION OF THE COMPREHENSIVE SANITATION OF THE MUNICIPALITY OF LA CELA DE NÚÑEZ IN MURO DE ALCOY

The first work carried out consists of the capture of the existing general collector upstream of the discharge, specifically at the level of the road connecting to the CV-705. There a logging well has been executed with a small ledge from which a newly executed manifold starts. From this junction well is born a buried […]
REPAIR OF THE CORONATION ROAD OF THE DAM AND ACCESS TO THE TRANSFORMATION CENTRE OF THE RESERVOIR DEL REGAJO, TM DE JÉRICA

The work carried out consisted of providing technical assistance to the voluntary management of the works. The main features are: Rethinking the access road to the dam and the coronation road Preparation of the land to be subsequently paved Placement of perimeter curb Demolition of the old coffins of the coronation road and execution of […]
IMPROVEMENT OF THE SAFETY OF FACILITIES AND ACCESS TO THE ARENÓS DAM

The work carried out consisted of providing technical assistance to the voluntary management of the works. The main features are: Improvement of access roads and dam interiors Upgrading of dam tunnels, wells and chambers Signalling and marking of the facilities, considering the installation of six barriers for vehicles Construction of a new access bridge to […]