Menu

SAGUNTO, VALENCIA, ESPAÑA

PROJECT FOR THE RENOVATION OF COLLECTORS IN THE PORT OF SAGUNTO

Working field

Hydraulics and water treatment

Client

EXCMO. AYUNTAMIENTO DE SAGUNTO

Ending Year

2011

Budget

641.602,12 €

Detailed description of the project

The objective of the project is to define and dimension each of the materials and installations necessary to renovate the sewage and rainwater collection networks in Luis Cendoya Street and Avenida del Mediterráneo in Puerto de Sagunto.

The actions developed in the Project are intended to replace the current unitary network of Avenida del Mediterráneo, which is insufficient during heavy rainfall events, with a separate network, conducting the rainwater to an existing storm tank. The sewage will be conveyed to the existing pumping station on Avenida del Mediterráneo with sufficient slopes to avoid the current drainage problems.

  • The work includes:
    Demolitions and previous works:
    -283.46 m3 concrete demolition
    -2.968,44 ml pavement cutting
    -1,786.89 m2 demolition of hot bituminous mixtures, loading and transport to landfill.
  • Sewage and stormwater network; collection through corrugated PVC gravity sewers:
    -30 ml with a diameter of 400 mm
    -480 ml with a diameter of 600 mm
    -of 344.4 ml with a diameter of 800 mm
    -316 ml with a diameter of 1000 mm
    -100 ml of concrete with a diameter of 600 mm
  • Paving of roadways and pedestrian areas:
    -237.32 m2 of hydraulic tiles
    -368.68 m3 of artificial gravel
    -433.82 m3 of concrete
    -2,739.39 m2 of hot bituminous mixes

FEATURED

PROJECTS