BRIDGES AND REINFORCED CONCRETE WORKS ON THE NCOAMBENG-MIBONDE-ELON SECTION OF RAILWAY
Design of three road bridges with cantilevered pedestrian walkways and two reinforced concrete works for vehicle passage, projecting two 3.5 m wide lanes. The project includes the following: Factory work 1: 11 metres of light, two holes of 4.75×3.5 m, 0.5 metres of thickness in strips and slabs Factory work 2: 6 meters of light, […]
COMPARATIVE STRUCTURAL CALCULATION OF CONSTRUCTION SYSTEMS
The scope of the consultancy was: To carry out the structural calculation of a typical Module (2 blocks of flats) of those that make up the mentioned project, according to the Profile document and the Soil Study, taking three types of construction systems: Concrete Structural Frameworks. Structural Concrete Masonry. Reinforced Concrete Bearing Walls Make the […]
EMERGENCY REPAIR WORKS FOR THE FOUNDATION AND PILES OF THE ACCESS VIADUCT TO THE PORT OF VALENCIA
Technical assistance for the works included the following activities: Follow-up to proceedings: Elaboration of a photographic report of the whole work. Monitoring of compliance with the construction guidelines established by the Directorate-General for Roads. Supervision of work: Establishment of the construction guidelines necessary for the proper execution of the works. Elaboration and monitoring of the […]
PROJECT FOR THE CONSTRUCTION OF A NEW WALKWAY FOR PEDESTRIAN AND CYCLIST ACCESS
The project consisted of the construction of a new footbridge for pedestrian and cycling traffic over the Picassent ravine, which will allow an adequate connection to public transport. This action favours the permeability between the urban core of Omet and the metro station on the VT-001 railway infrastructure of F.G.V. in Picassent. The walkway was […]