COLLECTOR WORKS IN BENIDORM AND VILLAJOYOSA AND EXTENSION OF THE BENIDORM WATER TREATMENT PLANT

Detailed description of the project The work consisted of the construction of an extension of the existing WWTP and a network of Collectors and Impulses next to the corresponding Pumping Stations for feeding the WWTP and the collector for the Reuse of Treated Water and another for Dumping into the Sea. With the expansion of […]
LANDSCAPE STUDY OF THE GENERAL PLAN OF TORÁS T.M.

Within the framework of the revision of the Municipal Urban Planning, through the drafting of the General Plan of Torás. This master plan was accompanied by a Landscape Study. The Landscape Study identifies the different existing units, from the factors orography, vegetation and anthropic uses. The most valuable landscapes are identified, as well as landscape […]
CONSTRUCTION PROJECT FOR THE GENERAL COLLECTORS AND W.W.T.P. OF THE MUNICIPALITY OF XILXES

Detailed description of the project The following works are planned: New system of sewerage pipes (7,200 m) and pumping stations: due to the inadequacy of the current general sewer compared to the growth forecasts of the municipality, the construction of a network covering all the new urban areas, the beach core and the village of […]
BUILDING PROJECT FOR LEISURE PREMISES

Detailed description of the project The works covered by this project consist of the urbanisation and the construction of buildings (ships) on plots A and B. As well as an area of premises on block C. Building for premises: The building has an arched floor that follows the northern line delimiting the plot. In this […]
PROJECT FOR THE CONSTRUCTION OF A WATER TREATMENT PLANT IN LA NUCIA

Detailed description of the project The Municipality’s Master Plan for Exploitation includes the installation of a new water purification plant to eliminate the sporadic events of increased water turbidity and the presence of geosmin (a substance produced by some bacteria, which gives the water a taste and smell of mouldy soil). These events occur in […]
WORKS BY THE GENERAL COLLECTORS AND WWTP OF NOVELDA AND MONFORTE DEL CID

Detailed description of the project The works consist of the construction of the collector system and a new treatment plant using biological treatment in two stages, for a flow rate of 9,000 m3/day (54,000 inhab-eq). The works include: – Wastewater treatment plant for the towns of Novelda and Monforte del Cid, divided into two treatment […]
TRANSFER PLANT FOR HAZARDOUS AND NON-HAZARDOUS INDUSTRIAL WASTE IN SAGUNTO

The urbanization and development of the industrial estate of Sagunto, with industries related to metallurgy and fuels, among others, is presented as an opportunity for the development of a hazardous and non-hazardous industrial waste transfer center (CTR) close to it, allowing a more economical waste management. The CTR will be located on an area of […]
ZONAL WASTE PLAN OF ZONE XVII OF THE COMPREHENSIVE WASTE PLAN

The work involved monitoring and improving the study of the needs and resources of Zone XVII and its interaction with demography, geology, hydrology, urban planning, transport constraints and protected natural areas, in order to obtain suitable areas for the location of waste recovery and disposal facilities in the region. The analysis and diagnosis of the […]
CONSTRUCTION PROJECT FOR THE IMPROVEMENT WORKS OF THE WWTP OF VORA RIU IN VILA REAL

Detailed description of the project The objectives to be achieved by the Sanitation Entity with the realization of the actions of improvement in the existing WWTP of Vora Riu, are: Expansion of treatment capacity to absorb the growth of the municipality, both urban and industrial. Increased flexibility and guarantees of the purification process. Optimization of […]
ZONAL WASTE PLAN OF ZONE XIV OF THE COMPREHENSIVE WASTE PLAN

The work involved a study of the needs and resources of Zone XIV, as well as their interaction with demography, geology, hydrology, urban planning, transport constraints and protected natural areas, with a view to obtaining suitable indicative areas for the location of waste recovery and disposal facilities in the region. The analysis and diagnosis of […]