PROJECT 2 OF THE NEW WASTE LANDFILL AT THE ESR TREATMENT PLANT IN ELCHE

The work consisted of drafting the Construction Project and the Modified Project for the new operating cell of a municipal solid waste landfill, with an approximate budget of €6,313,925.83. The Elche landfill serves an equivalent population of 325,490 inhabitants, corresponding to the Zonal Waste Plan of Zone XVIII of the Valencian Community. The total approximate […]

SOLID WASTE RECYCLING AND COMPOSTING PLANT AND CONTROLLED WASTE LANDFILL IN ELCHE

The project consists of the construction of a recycling and composting plant for an equivalent population of 325,490 inhabitants and has a budget of approximately €9,308,759.87. The main features of the work are: 50,000 m3 of excavations and 35,000 m3 of landfills. Paving of urban areas with 14.300 m2 of concrete for reinforcement and 65 […]

IMPROVEMENT OF FONT DE LA PEDRA WASTE WATER TREATMENT PLANT

Detailed description of the project Due to the inability of the current plant to treat both the incoming flow and the high pollutant load (discharges from textile industries and mills), the existing facilities need to be renovated/expanded. Furthermore, due to the advanced state of eutrophication in which the Beniarrés reservoir is located, to which the […]

EXTENSION OF ALTEA, CALLOSA D’EN SARRIA, POLOP DE LA MARINA AND LA NUCÍA WWTP

The expansion works of the WWTP consist of the implementation of a new pretreatment, primary settling and biological treatment with nitrification-denitrification, secondary settling, aerobic digestion, thickening and drying of sludge. It has also acted on the equipment and the repair of the civil works of the apparatuses of the existing plant.

SEWAGE TREATMENT PLANT CALAMOCHA

The wastewater from the municipality of Calamocha was discharged into the Jiloca River with the consequent ecological and landscape impact. The Calamocha Wastewater Treatment Plant was built by the Aragonese Water Institute, under the government of Aragon, and co-financed with ERDF funds from the European Union. The calamocha WWTP is located about 2000 meters from […]

MANAGEMENT OF IMPROVEMENT WORKS AT THE TORREVIEJA WASTEWATER TREATMENT PLANT

Detailed description of the project Since the start of operation of the WWTP in 1982 and subsequent extensions, the inlet flows have continued to increase, due to the population growth, especially during the summer season, reaching now, to equalize during the summer months, the design flows of the plant. It is therefore necessary to extend […]

DIRECTORATE OF WORKS FOR THE DRINKING WATER MASTER PLAN OF THE MUNICIPALITY OF DENIA

Detailed description of the project The actions carried out focus on: New EDAS (desalination plant) using Beniadlá reverse osmosis for the purification of 8,000 m3/day. Improvements to Racons EDAS (16,000 m3/day). They consist of: the installation of a system for generating and dosing ozone from oxygen, the completion of the sludge treatment line generated during […]

ACCESS TO THE PORT OF CASTELLÓN

The work consisted of assisting the Optional Directorate for the control and supervision of the works, including the coordination of safety and health and the environmental monitoring necessary for the execution of the works, as well as the drafting of the amended project. That the main characteristics of the work executed are: Construction of a […]