WWTP OF GANDÍA AND SOUTHERN ZONE OF SAFOR (VALENCIA)
Technical assistance to the construction management for the diagnosis and design of the station, with the following characteristics: flow rate of 60,000 m3/day and 143,000 h-e; primary treatment; secondary treatment (using activated sludge); physico-chemical treatment (lamellar decantation); disinfection; chlorination; anaerobic digestion of sludge and biogas line.
PHOTOVOLTAIC INSTALLATION FOR IRRIGATION WELL, FOR THE COMMUNITY OF IRRIGATORS OF HONDÓN-MONOVAR
The purpose of the project is the design of a photovoltaic panels plant capable of producing a power of up to 200 kW, in order to power the well pumping equipment, which is currently connected to the grid. For this purpose, an installation consisting of a photovoltaic panel generator, consisting of 500 panels of 450 […]
CONSTRUCTION PROJECT OF ELECTRICAL UTILIZATION AT THE FOOT OF THE DAM OF ARENÓS RESERVOIR
The purpose of the Project is to describe the construction works for the hydroelectric exploitation at the foot of the dam, of the Arenós reservoir on the Mijares River in the province of Castellón. The main work planned is as follows: – Pipes: includes the installation of a steel pipe with a diameter of 1,550 […]
FINAL TREATMENT FACILITY FOR SHIP-GENERATED AND ASSIMILABLE LIQUID WASTE (MARPOL)
The purpose of the project is the construction of a final treatment facility for ship-generated liquid waste (Marpol 73/78 Annex I) and other assimilable liquid waste authorized by the Valencia Port Authority and the treatment of industrial water into aqueous solutions. The processes have been designed for ship-generated liquids so that the final product meets […]
ACCESS ROUNDABOUT TO BENIFAIÓ
The tasks carried out included: The works involved the construction of a roundabout on the CV-520 road, at the entrance to the Jaume I industrial estate in Benifaió, with the aim of controlling traffic speed and efficiently regulating road traffic. The roundabout has an internal diameter of 20 m, with a ring road of 8 […]
IMPROVEMENT OF ACCESS TO THE METAL BRIDGE OF ALBALAT DE LA RIBERA
The works of the modified project consist of improving access to the metal bridge of Albalat de la Ribera and Benicull, extending the platform, improving the layout and elevation and arranging traffic at the intersection of Benicull (by upgrading the existing intersection) and at the access to Albalat (by building a roundabout). The projected cross […]
IMPROVEMENT OF ACCESS TO THE NEW RAILWAY TERMINAL OF SAN VICENTE DEL RASPEIG
This document defines and develops the works corresponding to the PRELIMINARY PROJECT FOR IMPROVING ACCESSES TO THE NEW RAILWAY PORT OF SAN VICENTE DEL RASPEIG (ALICANTE) based on the solution obtained from the STUDY OF SOLUTIONS FOR IMPROVING ACCESS TO THE NEW RAILWAY PORT OF SAN VICENTE DEL RASPEIG (ALICANTE) drafted by the company VIELCA […]
CONTROL OF THE WORKS OF THE N-332 VARIANT OF ONDARA AND VERGEL
Detailed description of the project The work consisted of assisting the Directorate for the control and monitoring of the works and the environmental monitoring required for their execution, as well as the drafting of the amended project. That the main characteristics of the work executed are: Construction of a section of road with a one-way […]
FILES AND WORKS OF THE SOCIAL WELFARE COUNCIL
Detailed description of the project Contract of services and technical assistance to be carried out on various works or buildings dependent on the SOCIAL WELFARE COUNCIL. Among the works included in these contracts are the following: Review of projects and verification of compliance with current regulations. Implementation of Self-Protection Plans. Verification of compliance with current […]
ACTIONS IN HEALTH INFRASTRUCTURES WITHIN THE FRAMEWORK OF THE BUILDING HEALTH PROGRAMME
Detailed description of the project SUPPORT AND FOLLOW-UP OF ACTIONS IN HEALTH INFRASTRUCTURES WITHIN THE FRAMEWORK OF THE BUILDING HEALTH PROGRAMME”, the work carried out includes the following chapters: Supervision of projects: Supervision of the correlation between the project to be executed and the one submitted for the grant, as well as the content of […]