ENLARGEMENT AND REFORM OF EL HERRUMBLAR TOWN HALL

Detailed description of the project This Project defines the technical conditions for the expansion and reform of the City Council of El Herrumblar (Cuenca). The initial plot of the Town Hall is 95 m2. It has 3 heights, the Ground Floor being occupied by a doctor’s office. The extension will consist of the partial demolition […]

TECHNICAL ASSISTANCE FOR INSPECTION AND CONTROL OF THE ROS CASARES CIVIL WORKS

Detailed description of the project The technical assistance work consists of the inspection, revision, control and information to the client regarding the state of execution of each of the parts of the complex colloquially called CIUDAD ROS CASARES, including, both the exterior area of urbanization and roads, as well as the interior of each of […]

WORKS FOR THE REUSE OF TREATED WASTE WATER IN THE SOUTHERN ALBUFERA

Detailed description of the project The existing treatment plant collects wastewater from the urban centres of Alginet, Almussafes, Benifaió and Sollana, and from their industrial estates, resulting in an essential infrastructure for the good ecological status of the Natural Park of L’Albufera de Valencia. This WWTP is designed to serve 199,000 equivalent inhabitants, with a […]

CONTROL AND MONITORING OF MARINA BEACH IMPLEMENTATION

Detailed description of the project The work of the contract consisted of: the supervision and control of the implementation project at all stages of its approval; Monitoring of the work (technically and economically) Control of the documentation required for its proper processing And technical support to the management of the Works. The work includes the […]

CONSTRUCTION WORK FOR THE NEW WWTP OF ALCALÀ DE XIVERT

Detailed description of the project The following works are planned: New system of sewerage pipes (3,734 m driven and 1,140 m in gravity) and two new pumping stations, to convey the wastewater generated in the coastal area of Alcossebre to the new treatment plant of Alcalá de Xivert. Construction of the new Alcalà de Xivert […]

ENLARGEMENT WITH TERTIARY TREATMENT OF QUART-BENAGER WWTP

Detailed description of the project The works carried out consist of the extension of the Quart-Benáger WWTP, so that a tertiary treatment for the design flow, 60,000 m3/d (300,000 inhab-eq) is incorporated into it. The works have consisted of: Interception of the outlet water of the secondary decanters prior to its passage to disinfection; diverting […]

MANAGEMENT OF THE RENOVATION WORKS OF THE OLD WWTP OF BENIDORM

Detailed description of the project This WWTP was built in 1984, and although later works have been carried out to extend it, these have not been enough, so it has been necessary to undertake these works, aimed at solving the various deficiencies that it presented. The works have consisted of the reform of the Benidorm […]

LANDSCAPE STUDY OF THE GENERAL PLAN OF TORÁS T.M.

Within the framework of the revision of the Municipal Urban Planning, through the drafting of the General Plan of Torás. This master plan was accompanied by a Landscape Study. The Landscape Study identifies the different existing units, from the factors orography, vegetation and anthropic uses. The most valuable landscapes are identified, as well as landscape […]