MANAGEMENT OF THE CONSTRUCTION SITE OF THE COUNTY HOSPITAL OF LLIRIA

Detailed description of the project The works consist of the urbanization and construction of a district hospital. The area of the Project has a total construction area of 23,464 m2 divided into Ground Floor + 5 heights, and a total urbanization area of 27,909 m2, of which 15,765 m2 are gardens, 7,521 m2 correspond to […]
URBAN WASTE MANAGEMENT PROJECT IN ZONE XVII OF THE VALENCIAN COMMUNITY

The project consists of the construction of the recycling and composting and disposal facilities of the Zonal Plan for Solid Waste of Zone XVII of the Valencian Community and has an approximate budget of €117,354,714.60. The main features of the work are: Municipal Waste Recovery Facilities, which have an independent line of organic matter from […]
DRAFTING OF THE PROJECT OF PERGOLAS AND KIOSKS IN THE PINAR BEACH

The project aims to upgrade the promenade by installing pergolas and kiosks and has a budget of approximately USD 3,468,608. The solution adopted consists of the following actions: Kiosks: With a total area of 394,2 m2 for each unit. Facilities include kitchen, storage, toilets, table space and terraces. Exterior pavement: Area of 906 m2 with […]
RECYCLABLE WASTE COLLECTION CENTRE IN ASPE

The work carried out consists of the drafting of the construction project, site management and safety and health coordination of a clean spot (ecopark), which has a budget of approximately €953,311.38. The main features of the work are: Aspe and the surrounding area. Aspe and the surrounding area. 3,000 m3 of excavations. 1,800 m3 of […]
DRAFTING OF THE PROJECT FOR NEW FISHING FACILITIES IN THE PORT OF VINAROZ

Detailed description of the project The project aims at the construction of facilities for the sale of fish in the port of Vinaroz and has a budget of €10,288,713.86. The main features of the project are: Green areas: With an area of 4.952.50 m2 it surrounds the following planned buildings: Warehouse for pallet trucks. Fisherman’s […]
MANAGEMENT PROJECT FOR AREA XIV OF THE PIR

The work consisted of the Drafting of the ESR Management Plan, which includes the detailed Engineering for the Remodeling and Adaptation to the requirements of Zonal Plan XIV of the Composting and Valorization complex of RU in Piedra Negra, Xixona. The documentation prepared establishes the Management and Operation Plan, includes a Preliminary Project of Facilities, […]
MONITORING OF THE CONSTRUCTION OF RESIDENCES FOR THE ELDERLY

The purpose of the contract is to: On-site monitoring on a monthly basis of the implementation of the works of the elderly residences corresponding to the “Special Administrative Contract for Residential Care for Dependent Elderly People in the Valencian Community” For this purpose, VIELCA INGENIEROS S.A. has carried out the following actions: Technical control of […]
FILTRATION OF MICROPLASTICS ACCORDING TO THE CAPTURE MODEL IN MEDITERRANEAN MARINE ORGANISMS (REMOURE)

Participants: Global Omnium Medioambiente, S.L., Instituto Tecnológico Metalmecánico, Mueble, Madera, Embalaje y Afines (AIDIMME), Universidad Católica de Valencia (UCV), Control de Vertido Industrial (CVI) y Vielca Ingenieros, S.A. Summary:The REMOURE project aims to investigate the feeding apparatus of various marine species with high microplankton capture efficiency, to replicate it and apply it to the removal […]
WWTP AND BORRIOL WASTEWATER COLLECTOR

At present, the municipality of Borriol has a WWTP with insufficient treatment capacity for the quantity of wastewater it produces. The urban growth foreseen in the current planning, as well as the growing industrial development and the increase in the seasonal population, aggravate the problem. This is why, although industrial areas are planning the development […]
NEW WWTP OF MONCOFA

The construction of this new WWTP solves the problems posed by the former Moncofa WWTP and the Belcaire WWTP. The former Moncofa WWTP is less than 200 m away. of the buildings on the beach. It includes capacity problems due to its low slope and with the discharge point at 300 m. from the mouth […]