REFORM OF THE WWTP OF CASTELLÓN

REFORMA DE LA EDAR DE CASTELLÓN

The main objectives to be achieved with this project to improve and reform the Castellón WWTP, in order of priority, are: Minimize the number of unit processes involved in the water and sludge line. This implies a change in the type of treatment, i.e. a change from a conventional activated sludge process to a prolonged […]

DRINKING WATER TREATMENT PLANT FOR THE MUNICIPALITY OF LORIGUILLA

ESTACIÓN DE TRATAMIENTO DE AGUA POTABLE PARA EL MUNICIPIO DE LORIGUILLA

Work on a drinking water treatment plant is being carried out in the municipality of Loriguilla, which is currently supplied by a drinking water treatment plant using reverse osmosis. The project aims to develop a solution to deal with the following situations: Stopped by any cause of the osmosis plant. Depletion of allotted well water […]

DRINKING PLANT LAS PAVAS

PLANTA POTABILIZADORA LAS PAVAS

A comprehensive technical study has been carried out to define short- and medium-term action for the rehabilitation of the raw water catchment works and each of the unitary processes of the drinking water treatment plant in Las Pavas, El Salvador. This makes it possible to improve the conditions of collection, treatment and operation once the […]

HOSPITAL OF NUEVA SEGOVIA

HOSPITAL DEPARTAMENTAL DE NUEVA SEGOVIA

VIELCA INGENIEROS S. A. is in charge of the Supervision of the Replacement Works and Equipment of the Departmental Hospital of Nueva Segovia in Nicaragua. Activities carried out under this project: Supervision (technical, economic, environmental, social and administrative) of the contractor. Monitoring of supply. Reception, installation and verification of equipment. Traducir Monitoring of compliance with […]

WWTP PEÑÍSCOLA

EDAR PEÑISCOLA

The project defines the facilities of a new Wastewater Treatment Plant (WWTP) for the treatment of wastewater in the municipality of Peñíscola, reserving space for future expansion. It includes new sewerage pipelines from the urban area to the site of the WWTP. There is also the refurbishment and rehabilitation of the existing network, as well […]

CONSTRUCTION PROJECT FOR THE REHABILITATION OF THE V-23 MOTORWAY

rehabilitación del firme de la autovía V-23

Drafting of the construction project for the rehabilitation of the highway V-23 along the 10.5 km of its route for each of the two directions of traffic. The project includes the following work: Previous Studies of Topography, Traffic and Road. Dimensioning of the new road. Improved safety through new signalling, marking and containment systems. Traffic […]

CONSTRUCTION PROJECT OF REHABILITATION OF THE ROAD OF THE V-30 MOTORWAY

rehabilitación del firme de la autovía V-30

Drafting of the construction project for the rehabilitation of the main road of the V-30 motorway along the 17 km of its route for each of the two directions of traffic and for the 10.4 km stretch of slow track towards the Port of Valencia. The project includes the following work: Previous Studies of Topography, […]

ROAD CV-32 DE LA GOMBALDA

proyecto constructivo de la carretera CV-32

The purpose of this Construction Project is to define the construction works for the doubling of the CV-32, De la Gombalda road, between Pks 3+500 and 5+500, in the municipalities of Museros and Massamagrell. This section is an area where there are frequent queues at peak times due to the capacity constraints it entails in […]

UPGRADING AND MODERNISATION OF THE ELECTRICAL FACILITIES OF THE MARIA CRISTINA DAM

presa maria cristina

Drafting of the project to improve and modernize the electrical facilities of the Maria Cristina Dam.   The works carried out consisted of: Replacement of the Transformation Centre. Replacement of exterior lighting lines and luminaires. Replacement of interior lighting and installation of emergency lighting. Replacement of power lines to switchboards and receivers. Installation of a […]

RENOVATION OF PUBLIC LIGHTING INFRASTRUCTURE

alumbrado de Pozuelo de Alarcón

Drafting of the renovation project of the street lighting units of several streets in the town of Pozuelo de Alarcón, for the improvement and energy saving of the system.   The works carried out consisted of: Analysis of existing facilities Replacement of luminaires Replacement of staffs or columns.