MODERNISATION OF IRRIGATION IN THE MUNICIPALITIES OF SIMAT, BENIFAIRÓ AND TAVERNES DE LA VALLDIGNA

Description of the project The project consisted of modernising the irrigation method in the area of the municipalities of Simat, Benifairó and Tavernes de la Valldigna, located in the Comarca de la Safor (Valencia). The planning for the localized irrigation of this area has been thought of based on the construction of two reservoirs for […]
EMERGENCY SANITATION WORKS IN THE COASTAL AREA BETWEEN BENICASSIM AND CASTELLÓN

Detailed description of the project The emergency works connect the Benicàssim sewerage network and the Castellón sewerage network so that during the summer the excess of the Benicàssim network that cannot be treated at the Benicàssim WWTP can be diverted to the Castellón WWTP. There is a new DN-500 ductile cast iron pipe that connects […]
PROJECT FOR THE EXTENSION OF THE MUSKIZ SEWAGE TREATMENT PLANT (BIZCAYA)

THE WORKS HAVE CONSISTED IN THE DRAFTING OF THE NEW WWTP PROJECT COMPOSED OF WELL AND GRID OF COARSE AND PUMPING HEAD, REACTOR AND BIOLOGICAL TREATMENT MBBR , TERTIARY TREATMENT WITH MICROFILTRATION AND UV DISINFECTION. ENERGY EFFICIENCY IMPROVEMENTS WERE ALSO MADE WITH WIND TURBINES AND PHOTOVOLTAIC FACILITIES
ENVIRONMENTAL RESTORATION OF THE MAGRO RIVER BED FROM CAUDETE DE LAS FUENTES TO FORATA RESERVOIR

The works are developed from Caudete de las Fuentes to the Forata Reservoir, in an approximate length of 11 km and with a budget of 2,580.226.07 €. The region through which the Magro River flows in the reference section is mainly agricultural, with a preponderance of grape cultivation and livestock holdings. It includes important towns […]
ENVIRONMENTAL IMPROVEMENT OF THE OJOS DE MOYA RIVER AS IT PASSES THROUGH MIRA (CUENCA)

The project consisted mainly of the management of the roads adjacent to the riverbanks, including the construction of a perimeter wall, as well as the rehabilitation of the riverbanks for public use and the adaptation of the riverbed. The measures carried out extend over a stretch of 1,500 m in length and with an average […]
ACTIONS FOR THE IMPROVEMENT OF THE TANCAT DE LA PIPA

The project consisted of setting up a green filter in the middle of the Natural Park of the Albufera de Valencia, with the aim of collecting water from the Barranco del Poio and the Canal del Puerto de Catarroja, in order to purify it before returning it to the Lake of the Albufera. Maintenance elements […]
SUPPLY AND SEWER IMPROVEMENT PROJECT

DRAFTING OF THE PROJECT FOR THE RENOVATION OF SANITATION NETWORKS (CONSTRUCTION OF DUCTS, REPLACEMENT OF DUCTS, INSTALLATION OF NEW WELLS) AND SUPPLY NETWORKS (CONSTRUCTION OF DUCTS, CONSTRUCTION OF DRINKING WATER INLETS) DUE TO LACK OF CAPACITY, INTERCONNECTION REQUIREMENTS AND OBSOLESCENCE OF MATERIALS. A TOPOGRAPHIC SURVEY OF THE OPERATING ENVIRONMENT WAS CARRIED OUT.
ECONOMIC EVALUATION OF THE COST-EFFECTIVENESS OF THE FORESTRY ACTIONS OF THE PILOT FARMS OF THE LIFE+BOSCOS PROJECT

The LIFE+BOSCOS Project focuses on forest ecosystem governance demonstration actions for proper adaptation to climate change. Nine actions were implemented with multifunctional objectives: Maintain the agroforestry mosaic (currently in the process of agricultural abandonment). Increase the specific and structural biodiversity of forest ecosystems. Increase the vigour of forest masses to cope with the climate change […]
FINAL DRAFTING OF THE WORK OF THE YOUTH CENTRE OF THE MARKET

Detailed description of the project It is a building consisting of ground floor and basement. The basement is intended for garage. The room that houses the market is located on the ground floor but is elevated with respect to the level of the street. Occupying the central space of the market hall, the roof changes […]
SUPERVISION AND FOLLOW-UP OF THE ACTIVITIES OF THE PRODUCTIVE INVESTMENT PLAN UNDER THE ARCHITECTURE AND URBAN INFRASTRUCTURE DIVISION

Detailed description of the project The work carried out by VIELCA INGENIEROS S.A. under the contract of supervision and follow-up of the actions of the Special Plan to Support Productive Investment under the responsibility of the Division of Architecture and Urban Infrastructures, has consisted of promoting the actions necessary to facilitate the management, follow-up and […]