PLANNING STUDY METROPOLITAN GREEN RING OF VALENCIA SECTION MONCADA-MELIANA

The aim of the project is to build a green ring in the metropolitan area of Valencia. With the construction of this ring, the aim is to achieve an increase in travel by non-motorized vehicles, which is a model of sustainable mobility. This green ring is developed on the basis of three objectives: FUNCTIONALITY: The […]

CONSTRUCTION WORK FOR THE COLLECTOR OF TREATED WATER AT CAMP DE TÚRIA WWTP

In order to achieve the objectives set out in the planning of l’Eliana and by the Confederación Hidrográfica del Júcar, it is necessary to completely eliminate the non-rainwater discharges currently connected to the ovoid which constitutes the channel of the Mandor ravine. For this purpose, the discharge of effluent from the Camp de Turia I […]

ENVIRONMENTAL RESTORATION PROJECT OF THE AMADORIO RIVER

Detailed description of the project The works consist of the environmental upgrading of a stretch of the Amadorio River between the railway bridge and the sea, with a length of approximately 560 m and a budget of € 3,656,025. The solution adopted consists of the following actions: – Demolition of buildings in precarious condition, with […]

HYDROLOGICAL STUDIES OF SECTIONS 1 AND 2 AND SECTION 3 OF THE MONTGÓ COLLECTOR IN DENIA

Description of the project Topographical survey of the environment, revision and updating of previous hydrological studies, carrying out hydraulic calculations as well as structural calculations, design of singular works, including graphic description, definition of technical specifications and economic evaluation of the previous actions of the works to be carried out, the main characteristics of which […]

URBANIZATION PROJECT IN THE MUNICIPAL TERM OF NÁQUERA

The area of this Urbanization Project has an area of 1,547,650. 16 m2, of which 650,000. 00 m2 corresponds to a Golf Course, and the rest, i. e. 897,650. 16 m2 corresponds to residential use with a total of 1,786 homes. The work includes: General land movement of the sector. Dimensioning of vials with replanting […]

RENOVATED URBANIZATION PROJECT IN MISLATA (VALENCIA)

The area of action has an area of 23,000 m2 pedestrian, destined to be the square of the new City Hall. The work carried out in the Project is: General land movement of the sector. Dimensioning of firm of the square and the rest of pedestrian areas. Sewage network: waste water collected through 427. 73 […]

100 MW POWER PLANT IN KERANIGANJ, DHAKA

As part of its programme to increase energy production, the Bangladesh Power Development Board (BPDB) has initiated the construction of a number of power plants throughout the country. One of the new plants, which has been in operation since March 2012, is located in the city of Keraniganj in Dhaka District. The power plant has […]

CONSTRUCTION WORK FOR HIGH STORAGE WAREHOUSE IN MURO DE ALCOY

Detailed description of the project The works carried out included two projects: “Storage and Regulation Deposits and Upstream Distribution Networks at Muro de Alcoy” and “Storage and Regulation Deposits and Upstream Distribution Networks at Alquerías de Aznar”, between the two projects, the joint treatment system for treated water was implemented at the Font de la […]