STREAM CONTROL WORKS IN THE SAN JULIÁN RIVER BASIN

Detailed description of the project Restoration and extension of several river channels with a total length of 1850 m and a budget of USD 11,796,013. The solution adopted is to carry out the works in stages according to the following scheme: – Construction of a temporary channel on the left side of the river ravine. […]

EMERGENCY SANITATION WORKS IN THE COASTAL AREA BETWEEN BENICASSIM AND CASTELLÓN

Detailed description of the project The emergency works connect the Benicàssim sewerage network and the Castellón sewerage network so that during the summer the excess of the Benicàssim network that cannot be treated at the Benicàssim WWTP can be diverted to the Castellón WWTP. There is a new DN-500 ductile cast iron pipe that connects […]

PROJECT FOR THE EXTENSION OF THE MUSKIZ SEWAGE TREATMENT PLANT (BIZCAYA)

THE WORKS HAVE CONSISTED IN THE DRAFTING OF THE NEW WWTP PROJECT COMPOSED OF WELL AND GRID OF COARSE AND PUMPING HEAD, REACTOR AND BIOLOGICAL TREATMENT MBBR , TERTIARY TREATMENT WITH MICROFILTRATION AND UV DISINFECTION. ENERGY EFFICIENCY IMPROVEMENTS WERE ALSO MADE WITH WIND TURBINES AND PHOTOVOLTAIC FACILITIES

PROJECT OF RESTORATION OF HABITATS AND ADAPTATION FOR PUBLIC USE AT THE MOUTH OF THE POYO

The works are aimed at the environmental adequacy of the aquatic ecosystems present in the area and have a budget of approximately €1,388,260.54. The objectives of the actions are: Favour the development of biological communities, enhancing the recovery of endangered species in these environments. Promote the educational use of the space created, providing it with […]

ACTIONS FOR THE IMPROVEMENT OF THE TANCAT DE LA PIPA

The project consisted of setting up a green filter in the middle of the Natural Park of the Albufera de Valencia, with the aim of collecting water from the Barranco del Poio and the Canal del Puerto de Catarroja, in order to purify it before returning it to the Lake of the Albufera. Maintenance elements […]

SUPPLY AND SEWER IMPROVEMENT PROJECT

DRAFTING OF THE PROJECT FOR THE RENOVATION OF SANITATION NETWORKS (CONSTRUCTION OF DUCTS, REPLACEMENT OF DUCTS, INSTALLATION OF NEW WELLS) AND SUPPLY NETWORKS (CONSTRUCTION OF DUCTS, CONSTRUCTION OF DRINKING WATER INLETS) DUE TO LACK OF CAPACITY, INTERCONNECTION REQUIREMENTS AND OBSOLESCENCE OF MATERIALS. A TOPOGRAPHIC SURVEY OF THE OPERATING ENVIRONMENT WAS CARRIED OUT.