EXPANSION OF WASTE LANDFILL AT THE MSW TREATMENT PLANT IN ELCHE

vertedero elche

The work involved supervising and inspecting the construction works of a discharge cell of 279,889 m3 gross capacity (201,520.08 net reject tons) for an estimated duration of 24 months. The main features of the works are: Conditioning of stage I of cell 2: excavation of 45,099 m3 at the bottom of the pouring vessel. Filling […]

CELL II – PHASE II AND SEALING OF CELL I OF THE ELX LANDFILL

VERTEDERO DE ELX

Implementation of phase ii of cell ii of the non-hazardous waste landfill of els cremats in elx (alicante), according to the specific specifications of the integrated environmental permit to eliminate rejects from the existing municipal solid waste recycling and composting plant. cell ii has a total area of 119,315.73 m3 and will be operated with […]

NON-HAZARDOUS WASTE LANDFILL IN ELCHE

cremats

Supervision and inspection of the construction works of a waste cell, belonging to the Baix Vinalopó consortium, with a gross capacity of 596,167 m3 (429,240,27 tonnes net of rejections), for an estimated duration of 52 months. The main features of the work have been: Excavation of 68.025 me at the bottom of the pouring cup. […]

DEODORIZATION OF THE MUNICIPAL WASTE TREATMENT PLANTS OF THE VALDEMINGÓMEZ TECHNOLOGICAL PARK

TRATAMIENTO DE RESIDUOS

Design and drafting of 5 projects that consisted of the identification of technical improvements available for the minimization of odors of municipal solid waste treatment systems and biomethanization plants integrated in the technology park of Valdemingómez. The measures developed are based on improving the watertightness of vessels, increasing the number of hourly air renewal in […]

TRANSFER PLANT FOR HAZARDOUS AND NON-HAZARDOUS INDUSTRIAL WASTE IN SAGUNTO

The urbanization and development of the industrial estate of Sagunto, with industries related to metallurgy and fuels, among others, is presented as an opportunity for the development of a hazardous and non-hazardous industrial waste transfer center (CTR) close to it, allowing a more economical waste management. The CTR will be located on an area of […]

ZONAL WASTE PLAN OF ZONE XVII OF THE COMPREHENSIVE WASTE PLAN

The work involved monitoring and improving the study of the needs and resources of Zone XVII and its interaction with demography, geology, hydrology, urban planning, transport constraints and protected natural areas, in order to obtain suitable areas for the location of waste recovery and disposal facilities in the region. The analysis and diagnosis of the […]

ZONAL WASTE PLAN OF ZONE XIV OF THE COMPREHENSIVE WASTE PLAN

The work involved a study of the needs and resources of Zone XIV, as well as their interaction with demography, geology, hydrology, urban planning, transport constraints and protected natural areas, with a view to obtaining suitable indicative areas for the location of waste recovery and disposal facilities in the region. The analysis and diagnosis of […]

PROJECT 2 OF THE NEW WASTE LANDFILL AT THE ESR TREATMENT PLANT IN ELCHE

The work consisted of drafting the Construction Project and the Modified Project for the new operating cell of a municipal solid waste landfill, with an approximate budget of €6,313,925.83. The Elche landfill serves an equivalent population of 325,490 inhabitants, corresponding to the Zonal Waste Plan of Zone XVIII of the Valencian Community. The total approximate […]

SOLID WASTE RECYCLING AND COMPOSTING PLANT AND CONTROLLED WASTE LANDFILL IN ELCHE

The project consists of the construction of a recycling and composting plant for an equivalent population of 325,490 inhabitants and has a budget of approximately €9,308,759.87. The main features of the work are: 50,000 m3 of excavations and 35,000 m3 of landfills. Paving of urban areas with 14.300 m2 of concrete for reinforcement and 65 […]