IMPROVEMENT OF THE DRINKING WATER AND SEWERAGE SYSTEM IN THE CITY OF SAN JORGE AND BUENOS AIRES

The works covered by the Project are, in summary, the following: Drinking water component. Collection work: Three drilled wells 500 gpm (31.55l/s),Prof. 56 m and Diam 18”. pumping stations, Three stations with submersible pump and motor of 75, 74 and 69 HP ; Drive line, 8.04 Km of HFD pipes, Diam 200 mm, 250 mm […]
STUDIES AND DESIGNS FOR THE IMPROVEMENT AND EXPANSION OF THE DRINKING WATER SYSTEM OF DIRIAMBÁ

The works covered by the Project are, in summary, the following: Drinking water component. Collection work: 20 wells drilled from 14 to 22 l/s, Prof. from 320 to 380 m and Diam of 18″. Pumping stations, 20 Submersible pump and motor stations Drive line Supply and installation of 11,586 km of HFD piping including HFD […]
PROGRAMME TO IMPROVE ACCESS TO AND QUALITY OF WATER AND SANITATION SERVICES IN INTERMEDIATE CITIES IN HONDURAS

The BCIE contracted the services of VIELCA INGENIEROS to prepare the diagnosis, investment plan and terms of reference required for the studies and designs of the investments needed to renovate, expand and improve water and sanitation infrastructures, improve the quality, access and sustainability of services and strengthen the capacity of service providers in four intermediate […]
SUPERVISION OF THE DESIGN AND CONSTRUCTION OF SMALL-HAZARD IRRIGATION SYSTEMS

This project involved the establishment of an irrigation system that would initially benefit hundreds of families, most of them low-income and subsistence farming, living in the rural communities of El Plantel, Las Lomas, El Espinal and the urban centre of the municipality of Lamani, Comayagua Department. VIELCA INGENIEROS carried out the tasks of Supervision of […]
WORKS FOR THE REUSE OF TREATED WASTE WATER IN THE SOUTHERN ALBUFERA

Detailed description of the project The existing treatment plant collects wastewater from the urban centres of Alginet, Almussafes, Benifaió and Sollana, and from their industrial estates, resulting in an essential infrastructure for the good ecological status of the Natural Park of L’Albufera de Valencia. This WWTP is designed to serve 199,000 equivalent inhabitants, with a […]
CONSTRUCTION WORK FOR THE NEW WWTP OF ALCALÀ DE XIVERT

Detailed description of the project The following works are planned: New system of sewerage pipes (3,734 m driven and 1,140 m in gravity) and two new pumping stations, to convey the wastewater generated in the coastal area of Alcossebre to the new treatment plant of Alcalá de Xivert. Construction of the new Alcalà de Xivert […]
ENLARGEMENT WITH TERTIARY TREATMENT OF QUART-BENAGER WWTP

Detailed description of the project The works carried out consist of the extension of the Quart-Benáger WWTP, so that a tertiary treatment for the design flow, 60,000 m3/d (300,000 inhab-eq) is incorporated into it. The works have consisted of: Interception of the outlet water of the secondary decanters prior to its passage to disinfection; diverting […]
MANAGEMENT OF THE RENOVATION WORKS OF THE OLD WWTP OF BENIDORM

Detailed description of the project This WWTP was built in 1984, and although later works have been carried out to extend it, these have not been enough, so it has been necessary to undertake these works, aimed at solving the various deficiencies that it presented. The works have consisted of the reform of the Benidorm […]
COLLECTOR WORKS IN BENIDORM AND VILLAJOYOSA AND EXTENSION OF THE BENIDORM WATER TREATMENT PLANT

Detailed description of the project The work consisted of the construction of an extension of the existing WWTP and a network of Collectors and Impulses next to the corresponding Pumping Stations for feeding the WWTP and the collector for the Reuse of Treated Water and another for Dumping into the Sea. With the expansion of […]
CONSTRUCTION PROJECT FOR THE GENERAL COLLECTORS AND W.W.T.P. OF THE MUNICIPALITY OF XILXES

Detailed description of the project The following works are planned: New system of sewerage pipes (7,200 m) and pumping stations: due to the inadequacy of the current general sewer compared to the growth forecasts of the municipality, the construction of a network covering all the new urban areas, the beach core and the village of […]