PROJECT FOR THE CONSTRUCTION OF A WATER TREATMENT PLANT IN LA NUCIA

Detailed description of the project The Municipality’s Master Plan for Exploitation includes the installation of a new water purification plant to eliminate the sporadic events of increased water turbidity and the presence of geosmin (a substance produced by some bacteria, which gives the water a taste and smell of mouldy soil). These events occur in […]

WORKS BY THE GENERAL COLLECTORS AND WWTP OF NOVELDA AND MONFORTE DEL CID

Detailed description of the project The works consist of the construction of the collector system and a new treatment plant using biological treatment in two stages, for a flow rate of 9,000 m3/day (54,000 inhab-eq). The works include: – Wastewater treatment plant for the towns of Novelda and Monforte del Cid, divided into two treatment […]

CONSTRUCTION PROJECT FOR THE IMPROVEMENT WORKS OF THE WWTP OF VORA RIU IN VILA REAL

Detailed description of the project The objectives to be achieved by the Sanitation Entity with the realization of the actions of improvement in the existing WWTP of Vora Riu, are: Expansion of treatment capacity to absorb the growth of the municipality, both urban and industrial. Increased flexibility and guarantees of the purification process. Optimization of […]

IMPROVEMENT OF FONT DE LA PEDRA WASTE WATER TREATMENT PLANT

Detailed description of the project Due to the inability of the current plant to treat both the incoming flow and the high pollutant load (discharges from textile industries and mills), the existing facilities need to be renovated/expanded. Furthermore, due to the advanced state of eutrophication in which the Beniarrés reservoir is located, to which the […]

EXTENSION OF ALTEA, CALLOSA D’EN SARRIA, POLOP DE LA MARINA AND LA NUCÍA WWTP

The expansion works of the WWTP consist of the implementation of a new pretreatment, primary settling and biological treatment with nitrification-denitrification, secondary settling, aerobic digestion, thickening and drying of sludge. It has also acted on the equipment and the repair of the civil works of the apparatuses of the existing plant.

SEWAGE TREATMENT PLANT CALAMOCHA

The wastewater from the municipality of Calamocha was discharged into the Jiloca River with the consequent ecological and landscape impact. The Calamocha Wastewater Treatment Plant was built by the Aragonese Water Institute, under the government of Aragon, and co-financed with ERDF funds from the European Union. The calamocha WWTP is located about 2000 meters from […]

MANAGEMENT OF IMPROVEMENT WORKS AT THE TORREVIEJA WASTEWATER TREATMENT PLANT

Detailed description of the project Since the start of operation of the WWTP in 1982 and subsequent extensions, the inlet flows have continued to increase, due to the population growth, especially during the summer season, reaching now, to equalize during the summer months, the design flows of the plant. It is therefore necessary to extend […]

DIRECTORATE OF WORKS FOR THE DRINKING WATER MASTER PLAN OF THE MUNICIPALITY OF DENIA

Detailed description of the project The actions carried out focus on: New EDAS (desalination plant) using Beniadlá reverse osmosis for the purification of 8,000 m3/day. Improvements to Racons EDAS (16,000 m3/day). They consist of: the installation of a system for generating and dosing ozone from oxygen, the completion of the sludge treatment line generated during […]

SUPPLY PIPES TO BENICÁSSIM WITH WATER FROM THE OROPESA DEL MAR DESALINATION PLANT

Detailed description of the project The project is part of the pipelines that start at the Oropesa Desalination Plant to meet the increase in demand that will occur in Oropesa, Cabanes and Benicassim in the short and medium term. Among the branches supplying the towns mentioned above, the one in question runs from the diversion […]