IMPROVEMENT OF ROAD SAFETY IN CV-15 FROM PK 53 TO 56 AND PK 60 TO 61

The road of action is the CV-15 that connects the municipalities of La Pobla Tornesa and Vilafranca continuing to the edge of the community. The project includes action on three sections of this road: Action 1. Section from PK 53.30 (Coll de Ares) to PK 55.80. The action consists of improving road safety by improving […]
BASIC DESIGN AND CONSTRUCTION PROJECT OF THE CV-70 ROAD VARIANT. ALCOI-BENIDORM

The road of action is the CV-70 that connects the municipalities of Alcoi and Benidorm has a length of 45 km and connects the regions of Alcoià and Comtat in the interior of the Valencian Community with the coastal area, crossing the Sierra de Aitana. It is a mountain road with a winding route and […]
PROJECT FOR THE CONSTRUCTION OF THE ACCESS TO THE PORT OF VILLAJOYOSA

The aim of the project is to completely define the improvement of the route and road safety of the access road to the Port of Villajoyosa, reorganizing the accesses and intersections, giving the road an urban character by introducing sidewalks and bike lanes, and trying to fit the action within the reserve foreseen in the […]
EXTENSION TO THREE LANES ON THE A-7 MOTORWAY, VALENCIA RING ROAD (BY-PASS)

That this work consisted of assisting the Optional Directorate for the control and supervision of the works, including the coordination of safety and health and the environmental monitoring necessary for the execution of the works, as well as the drafting of the amended project. The main characteristics of the work executed are: Extension of a […]
CONSTRUCTION PROJECT OF THE RIOLA VARIANT

Currently, the CV-505 and CV-511 roads have an urban crossing section passing through the town of Riola, giving rise to two future variants, the southern one connecting to Fortaleny (connection of the CV-505 with the CV-511) and the western one, a variant to the CV-505 road. The subject of this project will be the southern […]
IMPROVEMENT OF THE CROSSING OF THE FIRST BELTWAY OF EIVISSA

The Project is developed in the Avenida de Sant Josep de Sa Talaia in the city of Ibiza. This avenue is located between KP 1+030 and KP 2+120 of the PM-801 road. The road has four lanes of traffic (two in each direction) separated by road markings. On the north side of these four lanes […]
TURIA PARK ROAD CONSTRUCTION PROJECT. MANISES-RIBAROJA SECTION

The road in question is the CV-370. It joins the municipalities of Manises and Ribaroja through an area of mainly agricultural and mining use, although with a high density of residential developments. The traffic of vehicles and heavy vehicles is high, as well as the accident rate. It currently has a section of two 3.50 […]
SUPPLY PIPES TO BENICÁSSIM WITH WATER FROM THE OROPESA DEL MAR DESALINATION PLANT

Detailed description of the project The project is part of the pipelines that start at the Oropesa Desalination Plant to meet the increase in demand that will occur in Oropesa, Cabanes and Benicassim in the short and medium term. Among the branches supplying the towns mentioned above, the one in question runs from the diversion […]
RENOVATION OF THE TINAJÓN SIPHON

Detailed description of the project The project consists of the renovation of the Tinajón siphon, which is located between the municipalities of Ulea and Molina de Segura, both in the province of Murcia. The existing siphon is composed of two parallel pipes of 1 m in diameter, with an approximate length of 2.2 km. The […]
PROJECT FOR THE RENOVATION OF COLLECTORS IN THE PORT OF SAGUNTO

Detailed description of the project The objective of the project is to define and dimension each of the materials and installations necessary to renovate the sewage and rainwater collection networks in Luis Cendoya Street and Avenida del Mediterráneo in Puerto de Sagunto. The actions developed in the Project are intended to replace the current unitary […]