PROJECT FOR THE RENOVATION OF COLLECTORS IN THE PORT OF SAGUNTO

Detailed description of the project The objective of the project is to define and dimension each of the materials and installations necessary to renovate the sewage and rainwater collection networks in Luis Cendoya Street and Avenida del Mediterráneo in Puerto de Sagunto. The actions developed in the Project are intended to replace the current unitary […]
DRAFTING OF THE FLOOD DEFENSE MASTER PLAN IN THE REGION OF LA MARINA BAJA

Detailed description of the project The project is being developed in the Marina Baja region (19 municipalities), with an area of 579 km2 and 180,000 inhabitants. There are two hydrological basins (Amadorio and Algar rivers), regulated by reservoirs. Work performed includes: Coordination and participation: Multidisciplinary team (CHJ, Universities and Engineering Consultants), Information Sources (Administrations of […]
SITE MANAGEMENT OF THE IMPROVEMENT WORKS OF THE SEWAGE NETWORK IN SUECA

Detailed description of the project The existing sanitation network in the town of Sueca is unitary. It comprises two main basins: the sewage network of the urban center of Sueca and the sewage network of the coastal urbanizations. In the initial situation, there are several problems associated with the sanitation and purification system of the […]
PLANNING STUDY METROPOLITAN GREEN RING OF VALENCIA SECTION MONCADA-MELIANA

The aim of the project is to build a green ring in the metropolitan area of Valencia. With the construction of this ring, the aim is to achieve an increase in travel by non-motorized vehicles, which is a model of sustainable mobility. This green ring is developed on the basis of three objectives: FUNCTIONALITY: The […]
CONSTRUCTION WORK FOR THE COLLECTOR OF TREATED WATER AT CAMP DE TÚRIA WWTP

In order to achieve the objectives set out in the planning of l’Eliana and by the Confederación Hidrográfica del Júcar, it is necessary to completely eliminate the non-rainwater discharges currently connected to the ovoid which constitutes the channel of the Mandor ravine. For this purpose, the discharge of effluent from the Camp de Turia I […]
IMPROVEMENT OF DRINKING WATER NETWORKS AND SANITATION IN THE URBANIZATION “LA TORRE Y ARCOS ESTE”

The aim of this project is to provide drinking water and sanitation to the entire urbanization. The scope of action includes the urbanizations called LA TORRE Y LOS ARCOS ESTE. The planned actions are defined as follows: Improved Sanitation Network. Separate sewerage and rainwater network. It consists of a waste disposal network with PVC with […]
ENVIRONMENTAL RESTORATION PROJECT OF THE AMADORIO RIVER

Detailed description of the project The works consist of the environmental upgrading of a stretch of the Amadorio River between the railway bridge and the sea, with a length of approximately 560 m and a budget of € 3,656,025. The solution adopted consists of the following actions: – Demolition of buildings in precarious condition, with […]
URBANIZATION PROJECT OF THE IV PHASE OF THE INDUSTRIAL ESTATE OF ALMANSA (ALBACETE)

The area of the Urbanization Project has an area of 270947.20 m2, of which 96.433.30 m2 correspond to endowment use, 9. 490. 40 m2 to tertiary use, 564. 00 to private endowment use and the rest 164. 459. 0 m2 correspond to industrial use. The work includes: General land movement of the sector. Dimensioning of […]
HYDROLOGICAL STUDIES OF SECTIONS 1 AND 2 AND SECTION 3 OF THE MONTGÓ COLLECTOR IN DENIA

Description of the project Topographical survey of the environment, revision and updating of previous hydrological studies, carrying out hydraulic calculations as well as structural calculations, design of singular works, including graphic description, definition of technical specifications and economic evaluation of the previous actions of the works to be carried out, the main characteristics of which […]
URBANIZATION PROJECT IN THE MUNICIPAL TERM OF NÁQUERA

The area of this Urbanization Project has an area of 1,547,650. 16 m2, of which 650,000. 00 m2 corresponds to a Golf Course, and the rest, i. e. 897,650. 16 m2 corresponds to residential use with a total of 1,786 homes. The work includes: General land movement of the sector. Dimensioning of vials with replanting […]