RENOVATION OF THE TINAJÓN SIPHON

Detailed description of the project The project consists of the renovation of the Tinajón siphon, which is located between the municipalities of Ulea and Molina de Segura, both in the province of Murcia. The existing siphon is composed of two parallel pipes of 1 m in diameter, with an approximate length of 2.2 km. The […]

PROJECT FOR THE RENOVATION OF COLLECTORS IN THE PORT OF SAGUNTO

Detailed description of the project The objective of the project is to define and dimension each of the materials and installations necessary to renovate the sewage and rainwater collection networks in Luis Cendoya Street and Avenida del Mediterráneo in Puerto de Sagunto. The actions developed in the Project are intended to replace the current unitary […]

DRAFTING OF THE FLOOD DEFENSE MASTER PLAN IN THE REGION OF LA MARINA BAJA

Detailed description of the project The project is being developed in the Marina Baja region (19 municipalities), with an area of 579 km2 and 180,000 inhabitants. There are two hydrological basins (Amadorio and Algar rivers), regulated by reservoirs. Work performed includes: Coordination and participation: Multidisciplinary team (CHJ, Universities and Engineering Consultants), Information Sources (Administrations of […]

SITE MANAGEMENT OF THE IMPROVEMENT WORKS OF THE SEWAGE NETWORK IN SUECA

Detailed description of the project The existing sanitation network in the town of Sueca is unitary. It comprises two main basins: the sewage network of the urban center of Sueca and the sewage network of the coastal urbanizations. In the initial situation, there are several problems associated with the sanitation and purification system of the […]

CONSTRUCTION WORK FOR THE COLLECTOR OF TREATED WATER AT CAMP DE TÚRIA WWTP

In order to achieve the objectives set out in the planning of l’Eliana and by the Confederación Hidrográfica del Júcar, it is necessary to completely eliminate the non-rainwater discharges currently connected to the ovoid which constitutes the channel of the Mandor ravine. For this purpose, the discharge of effluent from the Camp de Turia I […]

HYDROLOGICAL STUDIES OF SECTIONS 1 AND 2 AND SECTION 3 OF THE MONTGÓ COLLECTOR IN DENIA

Description of the project Topographical survey of the environment, revision and updating of previous hydrological studies, carrying out hydraulic calculations as well as structural calculations, design of singular works, including graphic description, definition of technical specifications and economic evaluation of the previous actions of the works to be carried out, the main characteristics of which […]

CONSTRUCTION WORK FOR HIGH STORAGE WAREHOUSE IN MURO DE ALCOY

Detailed description of the project The works carried out included two projects: “Storage and Regulation Deposits and Upstream Distribution Networks at Muro de Alcoy” and “Storage and Regulation Deposits and Upstream Distribution Networks at Alquerías de Aznar”, between the two projects, the joint treatment system for treated water was implemented at the Font de la […]

STREAM CONTROL WORKS IN THE SAN JULIÁN RIVER BASIN

Detailed description of the project Restoration and extension of several river channels with a total length of 1850 m and a budget of USD 11,796,013. The solution adopted is to carry out the works in stages according to the following scheme: – Construction of a temporary channel on the left side of the river ravine. […]

EMERGENCY SANITATION WORKS IN THE COASTAL AREA BETWEEN BENICASSIM AND CASTELLÓN

Detailed description of the project The emergency works connect the Benicàssim sewerage network and the Castellón sewerage network so that during the summer the excess of the Benicàssim network that cannot be treated at the Benicàssim WWTP can be diverted to the Castellón WWTP. There is a new DN-500 ductile cast iron pipe that connects […]