RENOVATED URBANIZATION PROJECT IN MISLATA (VALENCIA)

The area of action has an area of 23,000 m2 pedestrian, destined to be the square of the new City Hall. The work carried out in the Project is: General land movement of the sector. Dimensioning of firm of the square and the rest of pedestrian areas. Sewage network: waste water collected through 427. 73 […]
100 MW POWER PLANT IN KERANIGANJ, DHAKA

As part of its programme to increase energy production, the Bangladesh Power Development Board (BPDB) has initiated the construction of a number of power plants throughout the country. One of the new plants, which has been in operation since March 2012, is located in the city of Keraniganj in Dhaka District. The power plant has […]
CONSTRUCTION WORK FOR HIGH STORAGE WAREHOUSE IN MURO DE ALCOY

Detailed description of the project The works carried out included two projects: “Storage and Regulation Deposits and Upstream Distribution Networks at Muro de Alcoy” and “Storage and Regulation Deposits and Upstream Distribution Networks at Alquerías de Aznar”, between the two projects, the joint treatment system for treated water was implemented at the Font de la […]
PROJECT AND MANAGEMENT OF URBANIZATION AND TWO UNUSED BUILDINGS IN PEÑÍSCOLA

The works covered by this project consist of the urbanisation and the construction of buildings (ships) on plots A and B. As well as an area of premises on block C. Building for premises: The building has an arched floor that follows the northern line delimiting the plot. In this way it seems to be […]
STREAM CONTROL WORKS IN THE SAN JULIÁN RIVER BASIN

Detailed description of the project Restoration and extension of several river channels with a total length of 1850 m and a budget of USD 11,796,013. The solution adopted is to carry out the works in stages according to the following scheme: – Construction of a temporary channel on the left side of the river ravine. […]
MODERNISATION OF IRRIGATION IN THE MUNICIPALITIES OF SIMAT, BENIFAIRÓ AND TAVERNES DE LA VALLDIGNA

Description of the project The project consisted of modernising the irrigation method in the area of the municipalities of Simat, Benifairó and Tavernes de la Valldigna, located in the Comarca de la Safor (Valencia). The planning for the localized irrigation of this area has been thought of based on the construction of two reservoirs for […]
EMERGENCY SANITATION WORKS IN THE COASTAL AREA BETWEEN BENICASSIM AND CASTELLÓN

Detailed description of the project The emergency works connect the Benicàssim sewerage network and the Castellón sewerage network so that during the summer the excess of the Benicàssim network that cannot be treated at the Benicàssim WWTP can be diverted to the Castellón WWTP. There is a new DN-500 ductile cast iron pipe that connects […]
PROJECT FOR THE EXTENSION OF THE MUSKIZ SEWAGE TREATMENT PLANT (BIZCAYA)

THE WORKS HAVE CONSISTED IN THE DRAFTING OF THE NEW WWTP PROJECT COMPOSED OF WELL AND GRID OF COARSE AND PUMPING HEAD, REACTOR AND BIOLOGICAL TREATMENT MBBR , TERTIARY TREATMENT WITH MICROFILTRATION AND UV DISINFECTION. ENERGY EFFICIENCY IMPROVEMENTS WERE ALSO MADE WITH WIND TURBINES AND PHOTOVOLTAIC FACILITIES
ENVIRONMENTAL RESTORATION OF THE MAGRO RIVER BED FROM CAUDETE DE LAS FUENTES TO FORATA RESERVOIR

The works are developed from Caudete de las Fuentes to the Forata Reservoir, in an approximate length of 11 km and with a budget of 2,580.226.07 €. The region through which the Magro River flows in the reference section is mainly agricultural, with a preponderance of grape cultivation and livestock holdings. It includes important towns […]
ENVIRONMENTAL IMPROVEMENT OF THE OJOS DE MOYA RIVER AS IT PASSES THROUGH MIRA (CUENCA)

The project consisted mainly of the management of the roads adjacent to the riverbanks, including the construction of a perimeter wall, as well as the rehabilitation of the riverbanks for public use and the adaptation of the riverbed. The measures carried out extend over a stretch of 1,500 m in length and with an average […]