ACCESS ROUNDABOUT TO BENIFAIÓ

The tasks carried out included: The works involved the construction of a roundabout on the CV-520 road, at the entrance to the Jaume I industrial estate in Benifaió, with the aim of controlling traffic speed and efficiently regulating road traffic. The roundabout has an internal diameter of 20 m, with a ring road of 8 […]

IMPROVEMENT OF ACCESS TO THE METAL BRIDGE OF ALBALAT DE LA RIBERA

The works of the modified project consist of improving access to the metal bridge of Albalat de la Ribera and Benicull, extending the platform, improving the layout and elevation and arranging traffic at the intersection of Benicull (by upgrading the existing intersection) and at the access to Albalat (by building a roundabout). The projected cross […]

IMPROVEMENT OF ACCESS TO THE NEW RAILWAY TERMINAL OF SAN VICENTE DEL RASPEIG

This document defines and develops the works corresponding to the PRELIMINARY PROJECT FOR IMPROVING ACCESSES TO THE NEW RAILWAY PORT OF SAN VICENTE DEL RASPEIG (ALICANTE) based on the solution obtained from the STUDY OF SOLUTIONS FOR IMPROVING ACCESS TO THE NEW RAILWAY PORT OF SAN VICENTE DEL RASPEIG (ALICANTE) drafted by the company VIELCA […]

CONTROL OF THE WORKS OF THE N-332 VARIANT OF ONDARA AND VERGEL

Detailed description of the project The work consisted of assisting the Directorate for the control and monitoring of the works and the environmental monitoring required for their execution, as well as the drafting of the amended project. That the main characteristics of the work executed are: Construction of a section of road with a one-way […]

ACCESS TO THE PORT OF CASTELLÓN

The work consisted of assisting the Optional Directorate for the control and supervision of the works, including the coordination of safety and health and the environmental monitoring necessary for the execution of the works, as well as the drafting of the amended project. That the main characteristics of the work executed are: Construction of a […]

IMPROVEMENT OF ROAD SAFETY IN CV-15 FROM PK 53 TO 56 AND PK 60 TO 61

The road of action is the CV-15 that connects the municipalities of La Pobla Tornesa and Vilafranca continuing to the edge of the community. The project includes action on three sections of this road: Action 1. Section from PK 53.30 (Coll de Ares) to PK 55.80. The action consists of improving road safety by improving […]

PROJECT FOR THE CONSTRUCTION OF THE ACCESS TO THE PORT OF VILLAJOYOSA

The aim of the project is to completely define the improvement of the route and road safety of the access road to the Port of Villajoyosa, reorganizing the accesses and intersections, giving the road an urban character by introducing sidewalks and bike lanes, and trying to fit the action within the reserve foreseen in the […]

EXTENSION TO THREE LANES ON THE A-7 MOTORWAY, VALENCIA RING ROAD (BY-PASS)

That this work consisted of assisting the Optional Directorate for the control and supervision of the works, including the coordination of safety and health and the environmental monitoring necessary for the execution of the works, as well as the drafting of the amended project. The main characteristics of the work executed are: Extension of a […]

CONSTRUCTION PROJECT OF THE RIOLA VARIANT

Currently, the CV-505 and CV-511 roads have an urban crossing section passing through the town of Riola, giving rise to two future variants, the southern one connecting to Fortaleny (connection of the CV-505 with the CV-511) and the western one, a variant to the CV-505 road. The subject of this project will be the southern […]