Menu

IMPROVEMENT OF ROAD SAFETY IN CV-15 FROM PK 53 TO 56 AND PK 60 TO 61

The road of action is the CV-15 that connects the municipalities of La Pobla Tornesa and Vilafranca continuing to the edge of the community. The project includes action on three sections of this road: Action 1. Section from PK 53.30 (Coll de Ares) to PK 55.80. The action consists of improving road safety by improving […]

PROJECT FOR THE CONSTRUCTION OF THE ACCESS TO THE PORT OF VILLAJOYOSA

The aim of the project is to completely define the improvement of the route and road safety of the access road to the Port of Villajoyosa, reorganizing the accesses and intersections, giving the road an urban character by introducing sidewalks and bike lanes, and trying to fit the action within the reserve foreseen in the […]

EXTENSION TO THREE LANES ON THE A-7 MOTORWAY, VALENCIA RING ROAD (BY-PASS)

That this work consisted of assisting the Optional Directorate for the control and supervision of the works, including the coordination of safety and health and the environmental monitoring necessary for the execution of the works, as well as the drafting of the amended project. The main characteristics of the work executed are: Extension of a […]

CONSTRUCTION PROJECT OF THE RIOLA VARIANT

Currently, the CV-505 and CV-511 roads have an urban crossing section passing through the town of Riola, giving rise to two future variants, the southern one connecting to Fortaleny (connection of the CV-505 with the CV-511) and the western one, a variant to the CV-505 road. The subject of this project will be the southern […]

IMPROVEMENT OF THE CROSSING OF THE FIRST BELTWAY OF EIVISSA

The Project is developed in the Avenida de Sant Josep de Sa Talaia in the city of Ibiza. This avenue is located between KP 1+030 and KP 2+120 of the PM-801 road. The road has four lanes of traffic (two in each direction) separated by road markings. On the north side of these four lanes […]

TURIA PARK ROAD CONSTRUCTION PROJECT. MANISES-RIBAROJA SECTION

The road in question is the CV-370. It joins the municipalities of Manises and Ribaroja through an area of mainly agricultural and mining use, although with a high density of residential developments. The traffic of vehicles and heavy vehicles is high, as well as the accident rate. It currently has a section of two 3.50 […]

PLANNING STUDY METROPOLITAN GREEN RING OF VALENCIA SECTION MONCADA-MELIANA

The aim of the project is to build a green ring in the metropolitan area of Valencia. With the construction of this ring, the aim is to achieve an increase in travel by non-motorized vehicles, which is a model of sustainable mobility. This green ring is developed on the basis of three objectives: FUNCTIONALITY: The […]

URBANIZATION PROJECT IN THE MUNICIPAL TERM OF NÁQUERA

The area of this Urbanization Project has an area of 1,547,650. 16 m2, of which 650,000. 00 m2 corresponds to a Golf Course, and the rest, i. e. 897,650. 16 m2 corresponds to residential use with a total of 1,786 homes. The work includes: General land movement of the sector. Dimensioning of vials with replanting […]

RENOVATED URBANIZATION PROJECT IN MISLATA (VALENCIA)

The area of action has an area of 23,000 m2 pedestrian, destined to be the square of the new City Hall. The work carried out in the Project is: General land movement of the sector. Dimensioning of firm of the square and the rest of pedestrian areas. Sewage network: waste water collected through 427. 73 […]